INFORMED STREETS
Live / Registered — Registered (as of 15 Aug 2023)
What this means for you
Registered since 15 Aug 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90979871
- Registration number
- 7140155
- Mark type
- Design + words
- Filed
- 11 Jun 2021
- Published for opposition
- 04 Oct 2022
- Registered
- 15 Aug 2023
- Attorney of record
- Bryant J. Keller
Goods and services
- Class 035 — Advertising and business services: Business project management services for civil engineering and urban planning; Business project management services for construction projects in the field of underground utilities, pavement, thoroughfares, and roadways; Business consultation in the field of the development of pavement distress, pavement rating, and pavement management systems
- Class 037 — Building construction and repair services: Construction management supervision; Construction project management services; Construction, repair, and maintenance of underground utilities, pavement, and roadways; Construction, repair, and maintenance of underground utilities, pavement, thoroughfares, and roadways
- Class 042 — Scientific and technological services: Software as a service (SAAS) services featuring software for use with mapping assets, utilities, and right of ways, visualizing assets in a right of way, creating 3D augmented reality and virtual reality renderings of right of ways, and developing a pavement ratings and pavement management plan; Cartography and mapping; Land surveying; Engineering surveying; Urban planning; Urban design planning services; Civil engineering; Consulting in the field of civil engineering; Computer modeling services
Owner
- HORROCKS LLC, PLEASANT GROVE, UT, US
- Horrocks Engineers, Inc., Pleasant Grove, UT, US
- Horrocks Engineers, Inc., Pleasant Grove, UT, US
- Horrocks Engineers, Inc., Pleasant Grove, UT, US
Prosecution history
- 11 Apr 2025 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 15 Aug 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 15 Aug 2023 — REGISTERED-PRINCIPAL REGISTER
- 08 Jul 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 07 Jul 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 25 May 2023 — NOTICE OF DESIGN SEARCH CODE E-MAILED
- 24 May 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 28 Apr 2023 — USE AMENDMENT FILED
- 24 May 2023 — DIVISIONAL PROCESSING COMPLETE
- 28 Apr 2023 — DIVISIONAL REQUEST RECEIVED
- 23 May 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 02 May 2023 — ASSIGNED TO EXAMINER
- 28 Apr 2023 — TEAS REQUEST TO DIVIDE RECEIVED
- 28 Apr 2023 — TEAS STATEMENT OF USE RECEIVED
- 29 Nov 2022 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT