RPLUS HYDRO
Live / Applied — Third extension granted (statement of use) (as of 19 Jan 2026)
What this means for you
Not registered yet, but its 18 Aug 2021 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90889558
- Mark type
- Stylized text
- Filed
- 18 Aug 2021
- Published for opposition
- 30 Apr 2024
- Attorney of record
- Catherine Parrish Lake
Goods and services
- Class 037 — Building construction and repair services: Installation, repair and maintenance of renewable energy generation equipment; Construction, repair, maintenance and installation services for hydroelectric power plants; Installation, construction, maintenance and repair of transmission facilities, energy equipment, and energy systems; Maintenance and repair of the electrical or mechanical systems of others to eliminate or reduce electric power interruptions, fluctuations, transients, and harmonics; Power plant construction; all of the foregoing excluding oil and gas well, and oilfield services
- Class 039 — Transportation and storage services: Consultation in the field of energy transmission and distribution; Utility services, namely, transmission of electric power in the nature of renewable energy, in particular hydroelectric energy; all of the foregoing excluding oil and gas well, and oilfield services
- Class 040 — Treatment of materials: Production, conversion, inversion, transformation and conditioning of renewable energy, in particular into electricity from hydropower energy; Generation of electric power in the nature of renewable energy, namely, hydroelectric energy; all of the foregoing excluding oil and gas well, and oilfield services
Owner
- rPlus Energies, LLC, Salt Lake City, UT, US
- rPlus Energies, LLC, Salt Lake City, UT, US
Prosecution history
- 20 Jan 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 19 Jan 2026 — SOU EXTENSION 3 GRANTED
- 13 Nov 2025 — SOU EXTENSION 3 FILED
- 14 Nov 2025 — SOU TEAS EXTENSION RECEIVED
- 28 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 28 Oct 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Oct 2025 — SOU EXTENSION 2 GRANTED
- 25 Jun 2025 — SOU EXTENSION 2 FILED
- 27 Oct 2025 — SOU EXTENSION 1 GRANTED
- 19 Dec 2024 — SOU EXTENSION 1 FILED
- 27 Oct 2025 — CORRECTED NOA E-MAILED
- 27 Oct 2025 — DIVISIONAL PROCESSING COMPLETE
- 19 Dec 2024 — DIVISIONAL REQUEST RECEIVED
- 25 Jun 2025 — SOU TEAS EXTENSION RECEIVED
- 25 Jun 2025 — RESPONSE TO ITU OFFICE ACTION ENTERED