ECONIQ
Live / Applied — Fifth extension granted (statement of use) (as of 10 Feb 2026)
What this means for you
Not registered yet, but its 16 Aug 2021 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90885225
- Mark type
- Stylized text
- Filed
- 16 Aug 2021
- Published for opposition
- 17 Jan 2023
- Attorney of record
- Ellen A. Andelman
Goods and services
- Class 006 — Metal goods: Low emission steel and steel products, namely, steel plates, steel sheets, steel beams, steel pilings, steel rackings and steel bars; steel; steel beams; steel products, namely, steel plates, steel angles, steel round bars, steel flat bars, steel hexagon bars and steel sections in the nature of sheets, channels, hollow sections, columns, joists, pilings and rackings; metal wall panels; steel bridging for use as supports and bracing for flooring and roofs, spacers in the installation of flooring and roofs; steel fasteners, namely, bolts, nails, rivets, screws; metal fasteners, namely, bolts, nails, screws and nuts; specialty steels, namely, steel alloys; corrugated steel sheets; steel decking; steel joists and joist girders; steel buildings, namely, prefabricated metal buildings
Owner
- Nucor Corporation, Charlotte, NC, US
- Nucor Corporation, Charlotte, NC, US
Prosecution history
- 11 Feb 2026 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 10 Feb 2026 — SOU EXTENSION 5 GRANTED
- 18 Sept 2025 — SOU EXTENSION 5 FILED
- 09 Feb 2026 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 19 Sept 2025 — SOU TEAS EXTENSION RECEIVED
- 27 Feb 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 26 Feb 2025 — SOU EXTENSION 4 GRANTED
- 26 Feb 2025 — SOU EXTENSION 4 FILED
- 26 Feb 2025 — SOU TEAS EXTENSION RECEIVED
- 01 Nov 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 01 Nov 2024 — SOU EXTENSION 3 GRANTED
- 01 Nov 2024 — SOU EXTENSION 3 FILED
- 01 Nov 2024 — SOU TEAS EXTENSION RECEIVED
- 24 Apr 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 23 Apr 2024 — SOU EXTENSION 2 GRANTED