OUTPERFORM TODAY. TRANSFORM TOMORROW.
Live / Registered — Registered (as of 30 Sept 2025)
What this means for you
Registered since 30 Sept 2025. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90844952
- Registration number
- 7969128
- Mark type
- Stylized text
- Filed
- 23 Jul 2021
- Published for opposition
- 30 Aug 2022
- Registered
- 30 Sept 2025
- Attorney of record
- Sarah Anne Keefe
Goods and services
- Class 037 — Building construction and repair services: Construction services, namely, custom construction of houses and buildings by planning and custom cutting of lumber, lumber framing kits and building materials; construction services, namely, planning, laying out and custom cutting lumber for construction of residential and commercial buildings and structures; construction services, namely, planning, building, manufacturing, delivering and installing framing, millwork, doors, engineered wood products, stairs, synthetic lumber composed of cellular PVC, trusses, wall panels and windows; engineering design in the field of residential homes and components thereof; residential and commercial building construction; installation of home and building components and fixtures
- Class 039 — Transportation and storage services: Delivery of lumber, framing kits and construction materials and logistics thereof, namely, delivery of goods for others by truck
- Class 042 — Scientific and technological services: Architectural design in the field of residential homes and components thereof; engineering design in the field of residential homes and components thereof
Owner
- Builders FirstSource - Intellectual Property, L.P., Dallas, TX, US
- Builders FirstSource - Intellectual Property, L.P., Dallas, TX, US
- Builders FirstSource - Intellectual Property, L.P., Dallas, TX, US
Prosecution history
- 30 Sept 2025 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 30 Sept 2025 — REGISTERED-PRINCIPAL REGISTER
- 05 Sept 2025 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 05 Sept 2025 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 05 Sept 2025 — STATEMENT OF USE PROCESSING COMPLETE
- 04 Sept 2025 — USE AMENDMENT FILED
- 04 Sept 2025 — TEAS STATEMENT OF USE RECEIVED
- 31 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 31 Jul 2025 — SOU EXTENSION 5 GRANTED
- 15 Apr 2025 — SOU EXTENSION 5 FILED
- 31 Jul 2025 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 15 Apr 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 15 Apr 2025 — SOU TEAS EXTENSION RECEIVED
- 15 Apr 2025 — SOU EXTENSION 4 GRANTED
- 25 Oct 2024 — SOU EXTENSION 4 FILED