IONE

Live / Applied — Fourth extension granted (statement of use) (as of 08 Jul 2025)

What this means for you

Not registered yet, but its 22 Jul 2021 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
90843274
Mark type
Stylized text
Filed
22 Jul 2021
Published for opposition
23 May 2023
Attorney of record
Henry Query

Goods and services

  • Class 006 — Metal goods: structures and system components of metal for use in the production and storage of renewable and transition energy, including wind, wave, solar and hydrogen energy, namely, fixed and floating offshore platforms made primarily of metal, metal pipes, tubulars, flowlines and pipelines, and flexible pipes comprising primarily metal parts
  • Class 011 — Environmental control apparatus: offshore and subsea apparatus and equipment for the production and storage of renewable and transition energy, including wind, wave, solar and hydrogen energy, namely, solar collectors, solar energy receivers, solar reactors, wave energy converters, wave energy harvesting apparatus, and hydrogen generators
  • Class 037 — Building construction and repair services: construction, installation, maintenance and repair of renewable energy generation and storage systems and ancillary structures and equipment; construction project management services in the field of renewable energy generation and storage systems and ancillary structures and equipment; construction, installation, maintenance and repair of fixed and floating platforms for renewable energy generation and storage apparatus and ancillary structures and equipment; construction, installation, maintenance and repair of pipelines
  • Class 040 — Treatment of materials: technical consulting services in the field of renewable energy production
  • Class 042 — Scientific and technological services: technological consulting services in the field of renewable energy; engineering of renewable energy generation systems and ancillary structures and equipment; research and development of renewable energy generation systems and ancillary structures and equipment

Owner

Prosecution history

  • 15 Jan 2026 — SOU TEAS EXTENSION RECEIVED
  • 09 Jul 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 08 Jul 2025 — SOU EXTENSION 4 GRANTED
  • 08 Jul 2025 — SOU EXTENSION 4 FILED
  • 08 Jul 2025 — SOU TEAS EXTENSION RECEIVED
  • 03 Mar 2025 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 14 Jan 2025 — SOU EXTENSION 3 GRANTED
  • 13 Jan 2025 — SOU EXTENSION 3 FILED
  • 13 Jan 2025 — SOU TEAS EXTENSION RECEIVED
  • 22 Aug 2024 — ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
  • 08 Jul 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 08 Jul 2024 — SOU EXTENSION 2 GRANTED
  • 08 Jul 2024 — SOU EXTENSION 2 FILED
  • 08 Jul 2024 — SOU TEAS EXTENSION RECEIVED
  • 06 Jan 2024 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED

View this trademark record on Marksy