THE VIRGINIA CONSTRUCTION GROUP
Live / Registered — Registered (as of 13 Jun 2023)
What this means for you
Registered since 13 Jun 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90700167
- Registration number
- 7081423
- Mark type
- Design + words
- Filed
- 10 May 2021
- Published for opposition
- 06 Sept 2022
- Registered
- 13 Jun 2023
- Attorney of record
- Kevin W. Holt
Goods and services
- Class 037 — Building construction and repair services: General construction contracting; Construction management services; Construction of water treatment plants; Construction of wastewater treatment plants; Construction of gravity sewer pumping stations; Construction of water booster stations; Earthworks services in the nature of excavating for building construction; Construction grading services; Construction services, namely, site clearing, excavation, pad preparation, and grading; Utility pipeline installation and repair; Construction of storm sediment basins and ponds; Construction services, namely, concrete paving; Concrete pouring and forming for buildings and other commercial or public concrete structures; Excavation services; Construction services, namely, site clearing, excavation, pad preparation, and grading for sites; Construction management and maintenance services for landfill operations; Construction services, namely, storm water system construction management, and maintenance and repair of ditches, drainage culverts and pipes being components of storm water systems
Owner
- Anderson Construction, Inc., Lynchburg, VA, US
- Anderson Construction, Inc., Lynchburg, VA, US
- Anderson Construction, Inc., Lynchburg, VA, US
Prosecution history
- 13 Jun 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 13 Jun 2023 — REGISTERED-PRINCIPAL REGISTER
- 05 Jun 2023 — TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS
- 05 Jun 2023 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 05 Jun 2023 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 05 Jun 2023 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 10 May 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 09 May 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 05 May 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 May 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 27 Apr 2023 — USE AMENDMENT FILED
- 04 May 2023 — SOU EXTENSION 1 GRANTED
- 27 Apr 2023 — SOU EXTENSION 1 FILED
- 04 May 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 27 Apr 2023 — SOU TEAS EXTENSION RECEIVED