IZANA
Live / Registered — Registered (as of 11 Jul 2023)
What this means for you
Registered since 11 Jul 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90654471
- Registration number
- 7102761
- Mark type
- Stylized text
- Filed
- 19 Apr 2021
- Published for opposition
- 25 Apr 2023
- Registered
- 11 Jul 2023
- Attorney of record
- Bassam N. Ibrahim
Goods and services
- Class 009 — Scientific and electric apparatus: Downloadable computer software for remote monitoring of power plants; downloadable cloud-computing software for remote monitoring of power plants; computers for remote monitoring of power plants using communication networks; recorded computer operating software; computers
- Class 011 — Environmental control apparatus: Boilers, other than parts of machines, namely, industrial boilers, power boilers for burning solid fuels for clean renewable energy, boilers for thermal power plants, boilers for steam power plants, and fired steam generator boilers; air conditioners for industrial purposes
- Class 037 — Building construction and repair services: Repair or maintenance of geothermal and liquid air energy storage (LAES) power plants; consultation about the repair of power plants and information services relating thereto; consultation and providing information in the field of maintenance of power plants using remote monitoring; installation, maintenance, and repair of energy and power generating apparatus, equipment and installations; installing of boilers, turbines and power generating apparatus, equipment and power plants; construction of geothermal and liquid air energy storage (LAES) power plants; repair or maintenance of power generators; maintenance of apparatus and installations for generating power
- Class 040 — Treatment of materials: Custom manufacture of energy and power generating apparatus and equipment, namely, boilers, turbines
- Class 042 — Scientific and technological services: Design, programming and maintenance of computer programs for remote monitoring of power plants; providing online non-downloadable computer programs for remote monitoring of power plants; technical advice relating to operation of computers for remote monitoring of power plants; rental of computers for remote monitoring of power plants; rental of computer programs for remote monitoring of power plants; design, programming and maintenance of computer software; providing computer programs on data networks, namely, providing temporary use of on-line non-downloadable cloud computing software for remote monitoring of power plants; technical advice relating to operation of computers; rental of computers; rental of computer software; technical consultation services in the field of the design of power delivery systems and the design of power generators; design and development of energy distribution networks; engineering services in the field of power plants; engineering services in the field of power plants in the nature of civil engineering for the design of power plants; designing of machines, apparatus, instruments and their parts, and systems composed of such machines, apparatus and instruments; design of boilers, turbines and power generating apparatus and equipment; monitoring of power plants using remote monitoring hardware and non-downloadable software to ensure proper functioning
Owner
- SUMITOMO HEAVY INDUSTRIES, LTD., Tokyo, JP
- SUMITOMO HEAVY INDUSTRIES, LTD., Tokyo, JP
- SUMITOMO HEAVY INDUSTRIES, LTD., Tokyo, JP
Prosecution history
- 11 Jul 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 11 Jul 2023 — REGISTERED-PRINCIPAL REGISTER
- 25 Apr 2023 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 25 Apr 2023 — PUBLISHED FOR OPPOSITION
- 05 Apr 2023 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 22 Mar 2023 — ELECTRONIC RECORD REVIEW COMPLETE
- 17 Mar 2023 — ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED
- 11 Mar 2023 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 09 Mar 2023 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 09 Mar 2023 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 09 Mar 2023 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
- 18 Oct 2022 — NOTIFICATION OF FINAL REFUSAL EMAILED
- 18 Oct 2022 — FINAL REFUSAL E-MAILED
- 18 Oct 2022 — FINAL REFUSAL WRITTEN
- 28 Sept 2022 — TEAS/EMAIL CORRESPONDENCE ENTERED