PROPEX LOW CARBON SOLUTIONS
Live / Registered — Registered (as of 11 Apr 2023)
What this means for you
Registered since 11 Apr 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90629141
- Registration number
- 7026757
- Mark type
- Stylized text
- Filed
- 07 Apr 2021
- Published for opposition
- 04 Jan 2022
- Registered
- 11 Apr 2023
- Attorney of record
- Kathleen A. Rheintgen
Goods and services
- Class 019 — Non-metallic building materials: Vegetative reinforcement and soil stabilization systems comprising of non-metallic geotextile matting and anchors for erosion control; geotextiles, namely, a geotextile interlayer for use in concrete pavement systems; non-woven fabric for construction purposes; waterproofing membrane comprised of an adhesive coated nonwoven fabric; Erosion control and shoreline stabilization systems comprised primarily of non-woven non-metallic geotextile matting and woven non-metallic geotextile matting used for vegetation reinforcement and soil stabilization also including a framework, all sold together as a unit; non-woven geotextile fabrics made of synthetic materials for use in civil engineering and environmental applications; polypropylene fabric used to control sedimentation on construction sites; building products, namely, coated and laminated roofing fabrics; building products, namely, sheathing made of coated and laminated fabrics; geosynthetic products, namely, non-woven, stitch-bonded, composite textiles comprising man-made and natural materials for use in soil stabilization, soil separation, soil drainage, paving, soil reinforcement, sediment control, landfill lining systems, erosion control and vegetative establishment; non-woven agricultural fabrics made of man-made materials for use in vegetative containment
Owner
- Propex Operating Company LLC, Chattanooga, TN, US
- Propex Operating Company LLC, Chattanooga, TN, US
- Propex Operating Company LLC, Chattanooga, TN, US
Prosecution history
- 11 Apr 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 11 Apr 2023 — REGISTERED-PRINCIPAL REGISTER
- 07 Mar 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 04 Mar 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 03 Mar 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 07 Feb 2023 — USE AMENDMENT FILED
- 27 Feb 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 07 Feb 2023 — TEAS STATEMENT OF USE RECEIVED
- 03 Sept 2022 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 01 Sept 2022 — SOU EXTENSION 1 GRANTED
- 01 Sept 2022 — SOU EXTENSION 1 FILED
- 01 Sept 2022 — SOU TEAS EXTENSION RECEIVED
- 01 Mar 2022 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 04 Jan 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 04 Jan 2022 — PUBLISHED FOR OPPOSITION