ECO START
Live / Registered — Registered (as of 07 Mar 2023)
What this means for you
Registered since 07 Mar 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90579321
- Registration number
- 6997459
- Mark type
- Stylized text
- Filed
- 15 Mar 2021
- Published for opposition
- 26 Apr 2022
- Registered
- 07 Mar 2023
- Attorney of record
- Jeffrey D. Larson
Goods and services
- Class 007 — Machines and machine tools: Equipment used in oil and gas well improvement and/or completion services and oil or gas well hydraulic fracturing operations, namely, trailer mounted and body load high-pressure frac pumps, trailer mounted and body load blenders; high-pressure pumps used in oil and gas well services
- Class 037 — Building construction and repair services: Hydraulic fracturing of oil and gas wells; oil and gas well pressure pumping services; oilfield services, namely, cementing well casing strings as part of the well construction process, hydraulic fracturing and acidizing of target geologic formations to enhance production of the well, and pump-down services used to perforate the production areas of horizontal wells; oil and gas reservoir enhancement services, namely, hydraulic fracturing of subsurface geologic formations to enhance well production; cementing services for oil and gas wells; oil and gas well enhancing services, namely, the injection of nitrogen and acid to oil and gas wells to increase the oil and gas recovery; remedial work on oil and gas wells, namely, re-hydraulic fracturing and re-cementing services; oil and gas well fracturing
Owner
- Patterson-UTI Energy, Inc., Houston, TX, US
- Patterson-UTI Energy, Inc., Houston, TX, US
- Patterson-UTI Energy, Inc., Houston, TX, US
Prosecution history
- 07 Mar 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 07 Mar 2023 — REGISTERED-PRINCIPAL REGISTER
- 03 Feb 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 02 Feb 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 12 Jan 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 11 Jan 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 21 Dec 2022 — USE AMENDMENT FILED
- 11 Jan 2023 — SOU EXTENSION 1 GRANTED
- 21 Dec 2022 — SOU EXTENSION 1 FILED
- 11 Jan 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 21 Dec 2022 — SOU TEAS EXTENSION RECEIVED
- 05 Dec 2022 — TEAS STATEMENT OF USE RECEIVED
- 21 Jun 2022 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 26 Apr 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 26 Apr 2022 — PUBLISHED FOR OPPOSITION