NEWCRETE
Dead / Abandoned — Abandoned — failure to respond (as of 07 Apr 2022)
What this means for you
This application is over — abandoned 17 Mar 2022. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 90538259
- Mark type
- Stylized text
- Filed
- 22 Feb 2021
- Abandoned
- 17 Mar 2022
Goods and services
- Class 001 — Chemicals: Concrete additives; Concrete admixtures; Agglutinants for concrete; Chemical additives for use as binding agents in concrete; Chemical additives for concrete building components; Chemical compounds for curing concrete
- Class 007 — Machines and machine tools: Concrete construction machines
- Class 017 — Rubber goods: Rapid cure, high strength, polymer-based concrete patching compound; Wall system consisting of insulated concrete block
- Class 019 — Non-metallic building materials: Concrete beams; Concrete blocks; Concrete building materials, namely, polymer modified panels, blocks, beams, trusses, and other configurations used in concrete buildings and kits; Concrete drainage structures, namely, trench drains; Concrete fencing in the nature of a noise barrier; Concrete floors; Concrete footings; Concrete mix; Concrete panels; Concrete patching compound made of a tar base; Concrete pipes; Concrete poles for use as building materials; Concrete retaining walls; Concrete road pavement boards; Concrete stair treads; Concrete walls; Concrete walls for building; Asphalt-based coatings for use on concrete building components; Blocks of concrete; Building materials, namely, concrete-based slabs made using recycled glass; Building materials, namely, pre-cast concrete wall forms; Construction materials in the nature of non-metal composite panels composed primarily of polymer modified concrete; Construction materials, namely, energy conserving precast concrete slabs; Construction materials, namely, concrete slabs designed to increase energy efficiency and energy conservation; Construction materials, namely, energy conserving concrete slabs; Containment systems for large scale liquid spills or releases, namely, berms made of polymer concrete, vinyl, or fiberglass; Crash barriers of polymer modified concrete for roads; Drain pipes made of polymer modified concrete; Floor patching materials, namely, concrete sealers; Industrial concrete for use in civil engineering works; Non-metal slabs of polymer modified concrete; Non-metallic reinforcements for concrete and wood building construction, namely, plates, rods and bars; Offshore drilling platforms made primarily of concrete; Polymer concrete; Ready to use concrete; Self-leveling concrete for use in building construction; Slabs of concrete designed to conserve energy; Stepping and footing stones of concrete or wood for use in lawns and pathways; Stucco in the nature of decorative concrete overlays; Tar-based concrete and asphalt patching compound; Tombstones of stone, concrete or marble; Transportable precast concrete buildings; Wall system consisting of reinforced, dry-stacked, engineered concrete block with insulating core and coated with surface bond cement
- Class 037 — Building construction and repair services: Concrete pumping; Cement parging of interior and exterior stone block and concrete foundations; Construction of civil engineering structures by forming concrete; Construction of civil engineering structures by laying concrete; Construction of civil engineering structures by pouring concrete; Construction of civil engineering structures using concrete; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services
- Class 040 — Treatment of materials: Processing of concrete
Owner
- New Village Initiative LLC, Park Rapids, MN, US
Prosecution history
- 07 Apr 2022 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 07 Apr 2022 — ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
- 07 Apr 2022 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 04 Apr 2022 — ASSIGNED TO EXAMINER
- 16 Sept 2021 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 16 Sept 2021 — NON-FINAL ACTION E-MAILED
- 16 Sept 2021 — NON-FINAL ACTION WRITTEN
- 16 Sept 2021 — ASSIGNED TO EXAMINER
- 22 May 2021 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 25 Feb 2021 — NEW APPLICATION ENTERED