SEMPRA INFRASTRUCTURE
Live / Registered — Registered (as of 05 Dec 2023)
What this means for you
Registered since 05 Dec 2023. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 90367137
- Registration number
- 7236906
- Mark type
- Stylized text
- Filed
- 08 Dec 2020
- Published for opposition
- 03 Aug 2021
- Registered
- 05 Dec 2023
- Attorney of record
- Kelly P. McCarthy
Goods and services
- Class 037 — Building construction and repair services: Maintenance services for energy related or energy using equipment, namely, heating, cooling, lighting, and electrical power generating systems and machinery, in particular turbines, boilers, generators, chilling plants, lighting equipment and associated wiring, conduits and control apparatus, water heaters, home heating and air conditioning units, and home appliances; Energy consumption reducing equipment installation; Recharging services, namely, charging station services for electric vehicles; Installation of electric vehicle charging stations; Installation of electrical and generating machinery; Maintenance and repair of pipelines supplying residential, commercial, industrial and governmental buildings and facilities; pipeline inspection services, namely, testing of gas pipelines; consulting services regarding electrically powered car maintenance and repair; consulting services in the field of charging of electric vehicles; consulting services regarding natural gas powered car maintenance and repair
Owner
- SEMPRA, SAN DIEGO, CA, US
- SEMPRA ENERGY, San Diego, CA, US
- SEMPRA ENERGY, San Diego, CA, US
- SEMPRA ENERGY, San Diego, CA, US
Prosecution history
- 13 Dec 2023 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 05 Dec 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 05 Dec 2023 — REGISTERED-PRINCIPAL REGISTER
- 03 Nov 2023 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 02 Nov 2023 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 12 Sept 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 11 Sept 2023 — STATEMENT OF USE PROCESSING COMPLETE
- 01 Sept 2023 — USE AMENDMENT FILED
- 11 Sept 2023 — SOU EXTENSION 4 GRANTED
- 01 Sept 2023 — SOU EXTENSION 4 FILED
- 11 Sept 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 01 Sept 2023 — SOU TEAS EXTENSION RECEIVED
- 01 Sept 2023 — TEAS STATEMENT OF USE RECEIVED
- 28 Mar 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 24 Mar 2023 — SOU EXTENSION 3 GRANTED