SPARK POWER

Live / Applied — Non-final action mailed (as of 16 Jun 2026)

What this means for you

Not registered yet, but its 13 Oct 2020 filing date beats anything filed after it. If it registers, the owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
90252130
Mark type
Stylized text
Filed
13 Oct 2020
Attorney of record
Ashish D. Patel

Goods and services

  • Class 037 — Building construction and repair services: Designing, building, selling and supporting specialized electrical control panels; development, engineering, designing, building, troubleshooting, and installing efficient and sustainable industrial electrical solutions; construction engineering and maintenance services for low, medium, and high voltage assets
  • Class 042 — Scientific and technological services: Complete technical and field construction planning, development, design, and engineering solutions for power systems and industrial applications including small to large-scale specialized electrical control panels, and stationary and portable power systems engineering; Electrical power system field services and specialty consulting engineering services in power distribution and generation systems; stationary and portable power system engineering and design; complete field technical services and renewable asset management including monitoring and testing of solar and wind power assets, and performance analytics to maintain operational efficiency and maximize performance; technical field services and sustainability solutions to keep operations up and running today and better equipped for tomorrow; construction engineering, operations and maintenance services, and restoration solutions for low, medium, and high Voltage Technical Services, and solar and wind renewable energy assets to maintain operational efficiency and maximize performance; end-to-end electrical contracting, operations and maintenance services, and energy sustainability solutions to the industrial, commercial, utility, and renewable asset markets; construction engineering and maintenance services for low, medium, and high voltage assets; renewable energy project management and operations and maintenance services, including field services; renewable energy asset monitoring, maintenance and performance analytics; industrial and commercial electrical contracting services, including the provision of labour, material, equipment and components; renewable energy asset monitoring, maintenance and performance analytics; complete asset management including monitoring and testing of solar and wind power assets to maintain operational efficiency and maximize performance; power/energy consulting and advisory services; power advisory, consultation, and customizable sustainability solutions that support the minimization of energy consumption, the management of energy generation, and eliminating corporations' carbon footprint with onsite solar, power purchase agreements, and/or green electricity; end-to-end electrical contracting, operations and maintenance services, and consulting on power advisory and energy sustainability solutions to the industrial, commercial, utility, and renewable asset markets; turnkey electrical contracting, operations and maintenance services, and power advisory and sustainability solutions that support the minimization of energy consumption, renewable energy management and generation, and elimination of corporations' carbon footprint with onsite solar, power purchase agreements, and/or green electricity; electrical power system field services and specialty consulting engineering services in power distribution and generation systems; consulting services related to behind-the-meter energy and storage solutions; turnkey electrical installation and support services; designing, building, selling and supporting specialized electrical control panels; energy and energy asset management services

Owner

Prosecution history

  • 14 Sept 2026 — APPLICATION EXTENSION GRANTED/RECEIPT PROVIDED
  • 14 Sept 2026 — APPLICATION EXTENSION TO RESPONSE PERIOD - RECEIVED
  • 16 Jun 2026 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 16 Jun 2026 — NON-FINAL ACTION E-MAILED
  • 16 Jun 2026 — NON-FINAL ACTION WRITTEN
  • 20 May 2026 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 20 May 2026 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 18 May 2026 — TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
  • 11 Dec 2025 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
  • 10 Dec 2025 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
  • 28 Aug 2025 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
  • 28 Aug 2025 — TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED
  • 28 Aug 2025 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 28 Aug 2025 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 28 Aug 2025 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED

View this trademark record on Marksy