CACTUS VALLEY

Live / Registered — Registered (as of 08 Jun 2021)

What this means for you

Registered since 08 Jun 2021. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
90035909
Registration number
6382134
Mark type
Stylized text
Filed
04 Jul 2020
Published for opposition
12 Jan 2021
Registered
08 Jun 2021
Attorney of record
Nathan Brown

Goods and services

  • Class 037 — Building construction and repair services: Plumbing; Air conditioning apparatus cleaning services; Air conditioning apparatus installation and repair; Air conditioning contractor services; Air conditioning vent sealing services; Constructing decks; Construction and installation of masonry walls and structures; Construction and renovation of buildings; Construction and repair of buildings; Construction management; Construction of buildings; Construction of modular buildings; Construction of modular homes; Construction planning; Electric appliance installation and repair; Electrical contracting; Electrical contractor services; Heating contractor services; Heating equipment installation and repair; HVAC contractor services; Plumbing and gas and water installation; Plumbing contractor services; Plumbing installation advisory services; Plumbing maintenance advisory services; Plumbing repair advisory services; Plumbing services; Repair or maintenance of boilers; Repair or maintenance of electric lighting apparatus; Repair work on buildings; Water main rehabilitation services; Boiler cleaning and repair; Building construction; Building construction and repair; Building construction information; Building construction supervision; Comprehensive preventative maintenance service for electrical systems; Contractor services, namely, review of and remedial recommendations for building plumbing, electrical and mechanical systems for others; Custom construction of homes; Drain and sewer cleaning and rootering services; Electrical repairs, maintenance, and installation of electrical wiring, outlets, light fixtures, and electrical panels; General contractor services, namely, plumbing, heating and air conditioning, carpentry, drywall, painting, electrical, building and framing contractor services; Installation and repair of air conditioning apparatus; Installation and repair of air-conditioning apparatus; Installation and repair of heating, ventilating and air conditioning equipment; Installation and replacement service for water heaters; Installation and replacement service for heating, ventilating and air conditioning systems; Installation of electric wiring; Installation of heating and air conditioners; Installation of plumbing; Installation of water purifiers; Installation, repair and maintenance of heating equipment; Irrigation devices installation and repair; Maintenance and repair of heating installations; Providing technical support, namely, technical advice concerning the installation, repair and maintenance of electric or electronic apparatus, equipment and devices used for automated or partly automated industrial operations; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; Repair of water supply apparatus; Repair of household appliances and of residential heating, plumbing, air conditioning, and electrical systems; Repair or maintenance of air-conditioning apparatus; Repair or maintenance of water purifying apparatus; Repair or maintenance of water purifying apparatus for industrial purposes; Repair or maintenance of gas water heaters; Restoration services in the field of water, smoke and fire damage

Owner

Prosecution history

  • 08 Jun 2021 — REGISTERED-PRINCIPAL REGISTER
  • 06 May 2021 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 05 May 2021 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 29 Apr 2021 — STATEMENT OF USE PROCESSING COMPLETE
  • 13 Apr 2021 — USE AMENDMENT FILED
  • 29 Apr 2021 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 13 Apr 2021 — TEAS STATEMENT OF USE RECEIVED
  • 09 Mar 2021 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 12 Jan 2021 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 12 Jan 2021 — PUBLISHED FOR OPPOSITION
  • 23 Dec 2020 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 09 Dec 2020 — LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN
  • 09 Dec 2020 — LETTER OF PROTEST EVIDENCE FORWARDED
  • 12 Oct 2020 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 12 Oct 2020 — ASSIGNED TO EXAMINER

View this trademark record on Marksy