DOOSAN MOBILITY INNOVATION
Live / Registered — Registered (as of 01 Sept 2020)
What this means for you
Registered since 01 Sept 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 88977985
- Registration number
- 6143779
- Mark type
- Stylized text
- Filed
- 07 Sept 2018
- Published for opposition
- 24 Sept 2019
- Registered
- 01 Sept 2020
- Attorney of record
- Lori S. Meddings
Goods and services
- Class 007 — Machines and machine tools: Mobile electric power generators; mobile electric generators using hydrogen and fuel cell technology for heating and air conditioning by using hydrogen and fuel cell technology; hydrogen-based electric generators for heating and air conditioning using fuel cell technology
- Class 009 — Scientific and electric apparatus: Fuel cells; electrochemical devices, namely, fuel cells; electrochemical devices configured for energy storage, namely, electrolysers; fuel cells configured for energy storage; fuel cells and structural parts thereof, fuel cell control systems comprised primarily of pressure sensors, ammeters and automatic valves, and structural parts thereof; electric control devices for energy management; computer programs for energy management; testing and measuring equipment for use in testing the performance and efficiency of fuel cell equipment; charging stations for electric vehicles equipped with fuel cells and hydrogen-based generators; computer software for use with navigation systems comprised of sensors, gyroscopes, accelerometers; computer hardware and peripheral devices, namely, navigation systems comprised of sensors, gyroscopes, accelerometers; Global positioning system (GPS) which can be used for unmanned aerial devices, land or water based remote control vehicles; computers for managing control devices for aircraft; tactical robots; computer application software for mobile phones, tablets, and handheld computers, for use in controlling and tracking drones, unmanned aerial vehicles (UAVs), and remotely-controlled video cameras
- Class 011 — Environmental control apparatus: Hydrogen-generation equipment and components, namely, hydrogen generators, hydrogen purifiers, hydrogen purification membranes, fuel processors, and steam reformers; fuel cell power plants; fuel cell power plants configured for recouping energy in pipeline applications, namely, natural gas pipelines; fuel cell power plants configured for capturing carbon emissions; fuel cell power plants configured for hydrogen production; fuel cell power plants configured for hydrogen separation; fuel cell power plants configured for energy storage
- Class 012 — Vehicles: Unmanned aerial vehicles (UAVs), and related operational software and printed manuals therefor, sold as a unit; unmanned aerial systems (UAS), comprised of drones and remote controllers for drones and related operational software and printed manuals therefor, sold as a unit; remote controlled UAVs, quad copters and drones, and related structural components of UAVs, namely, the body, arms, routers, motors, propellers, landing struts, stabilizers, and vibration isolators; robotic transport vehicles, and related structural components namely, the body, arms, routers, motors, propellers, landing struts, stabilizers, vibration isolators
Owner
- Doosan Corporation, Jung-gu, Seoul, KR
- Doosan Corporation, Jung-gu, Seoul, KR
- Doosan Corporation, Jung-gu, Seoul, KR
Prosecution history
- 01 Sept 2025 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 01 Sept 2020 — REGISTERED-PRINCIPAL REGISTER
- 28 Jul 2020 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 27 Jul 2020 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 02 Jun 2020 — STATEMENT OF USE PROCESSING COMPLETE
- 14 May 2020 — USE AMENDMENT FILED
- 02 Jun 2020 — DIVISIONAL PROCESSING COMPLETE
- 14 May 2020 — DIVISIONAL REQUEST RECEIVED
- 28 May 2020 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 14 May 2020 — TEAS REQUEST TO DIVIDE RECEIVED
- 14 May 2020 — TEAS STATEMENT OF USE RECEIVED
- 19 Nov 2019 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 24 Sept 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 24 Sept 2019 — PUBLISHED FOR OPPOSITION
- 04 Sept 2019 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED