TIMBERLYNE GROUP
Live / Registered — Registered (as of 07 Jun 2022)
What this means for you
Registered since 07 Jun 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 88944200
- Registration number
- 6754949
- Mark type
- Stylized text
- Filed
- 02 Jun 2020
- Published for opposition
- 23 Feb 2021
- Registered
- 07 Jun 2022
- Attorney of record
- Troy Leonard
Goods and services
- Class 019 — Non-metallic building materials: Building materials kit, primarily consisting of posts, roof and loft trusses, mass timber for building, and lumber all made of wood, non-metal windows, non-metal wall panels, and also including hardware, namely, metal brackets, and steel sheeting for the construction of a complete building or structure
- Class 037 — Building construction and repair services: Building construction; general construction contracting management; Building construction consulting; Construction of complete post-frame, post and beam, mortise and tenon, and mass timber buildings and structures
- Class 042 — Scientific and technological services: Architectural design services; construction drafting; interior design assist, technical consultation in the field of architecture, engineering surveying, and engineering
Owner
- Sand Creek Post & Beam, Inc., Wayne, NE, US
- Sand Creek Post & Beam, Inc., Wayne, NE, US
- Sand Creek Post & Beam, Inc., Wayne, NE, US
Prosecution history
- 07 Jun 2022 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 07 Jun 2022 — REGISTERED-PRINCIPAL REGISTER
- 03 May 2022 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 02 May 2022 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 02 May 2022 — STATEMENT OF USE PROCESSING COMPLETE
- 26 Apr 2022 — USE AMENDMENT FILED
- 26 Apr 2022 — TEAS STATEMENT OF USE RECEIVED
- 26 Apr 2022 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 25 Apr 2022 — SOU EXTENSION 2 GRANTED
- 19 Apr 2022 — SOU EXTENSION 2 FILED
- 25 Apr 2022 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 19 Apr 2022 — SOU TEAS EXTENSION RECEIVED
- 20 Aug 2021 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 18 Aug 2021 — SOU EXTENSION 1 GRANTED
- 18 Aug 2021 — SOU EXTENSION 1 FILED