DNBB
Dead / Abandoned — Abandoned — failure to respond (as of 03 Dec 2020)
What this means for you
This application is over — abandoned 24 Nov 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 88807348
- Mark type
- Stylized text
- Filed
- 23 Feb 2020
- Abandoned
- 24 Nov 2020
- Attorney of record
- Jonathan G. Morton
Goods and services
- Class 007 — Machines and machine tools: 3D printers; Adhesive bands for pulleys; Axles for machines; Bearings, as parts of machines; Components for machines and machine tools, grinding machines, material handling machines, food processing machines, chemistry processing machines and textile industry machines, namely, sand, chemical and reverse osmosis filters; Conveyer belts; Couplings for machines; Drives for machines; Linear actuators; Linear motions machines for moving objects; Machine parts namely, flexible shaft couplings; Machine parts, namely, bearing housings; Machine parts, namely, bearing inserts; Planetary gear motors; Power tool accessories, namely, cutting guides; Self-lubricating mechanical friction parts, especially of composite materials, namely, wear rings, washers, bushings, spherical bearings, bearing pads, sliding blocks and machine transmission gears all for load bearing machines, conveyors, handling trucks and machines, lifting machines, agricultural machinery, construction equipment machines and hydraulic turbines; Servo-motors; Shaft couplings for machines; Timing belts for industrial motors; Transmission gears for machines
Owner
- Dongguan Yuanzhou Information Technology Co., Ltd, Dong guan?Guangdong, CN
Prosecution history
- 03 Dec 2020 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 03 Dec 2020 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 22 May 2020 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 22 May 2020 — NON-FINAL ACTION E-MAILED
- 22 May 2020 — NON-FINAL ACTION WRITTEN
- 22 May 2020 — NON-FINAL ACTION WRITTEN
- 22 May 2020 — NON-FINAL ACTION WRITTEN
- 12 May 2020 — ASSIGNED TO EXAMINER
- 27 Feb 2020 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
- 26 Feb 2020 — NEW APPLICATION ENTERED