REGRID
Live / Registered — Registered (as of 29 Sept 2020)
What this means for you
Registered since 29 Sept 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 88745087
- Registration number
- 6162312
- Mark type
- Stylized text
- Filed
- 02 Jan 2020
- Published for opposition
- 14 Jul 2020
- Registered
- 29 Sept 2020
Goods and services
- Class 009 — Scientific and electric apparatus: Renewable energy storage, namely, an array of power storage batteries and electrical distribution equipment, sold as a unit, pre-equipped for deployment to remote locations or for the home or office, namely, racks for batteries; DC/AC power converters; electrical power distribution units; electrical controllers for use with power converters; electrical controllers used to reduce power consumption; power controllers; power distributing boxes; power inverters; power supplies; monitoring devices for monitoring battery performance characteristics; renewable battery system to provide backup power; Electrical energy storage pods comprised of rechargeable batteries and electrical power distribution units, namely, monitoring devices for monitoring battery performance characteristics; electrical controllers for use with power converters
Owner
- Clark, Shawn H., Edmond, OK, US
- Clark, Shawn H., Edmond, OK, US
- Clark, Shawn H., Edmond, OK, US
Prosecution history
- 29 Sept 2025 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 29 Sept 2020 — REGISTERED-PRINCIPAL REGISTER
- 14 Jul 2020 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 14 Jul 2020 — PUBLISHED FOR OPPOSITION
- 24 Jun 2020 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 11 Jun 2020 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 11 Jun 2020 — EXAMINER'S AMENDMENT ENTERED
- 11 Jun 2020 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 11 Jun 2020 — EXAMINERS AMENDMENT E-MAILED
- 11 Jun 2020 — EXAMINERS AMENDMENT -WRITTEN
- 25 Mar 2020 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 25 Mar 2020 — NON-FINAL ACTION E-MAILED
- 25 Mar 2020 — NON-FINAL ACTION WRITTEN
- 24 Mar 2020 — ASSIGNED TO EXAMINER
- 08 Jan 2020 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED