GOLDDUST

Dead / Abandoned — Abandoned — no statement of use filed (as of 27 Nov 2023)

What this means for you

This application is over — abandoned 27 Nov 2023. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
88724935
Mark type
Stylized text
Filed
12 Dec 2019
Published for opposition
01 Sept 2020
Abandoned
27 Nov 2023
Attorney of record
Kenneth S. Weitzman

Goods and services

  • Class 007 — Machines and machine tools: Power-operated downhole tools, namely, milling tools for removal of composite or dissolvable bridge plugs, circulation subs, coiled tubing connectors, jetting nozzles, cutting tools, cable heads, and centralizer subs; Machine tools for oil and gas well completion, namely, composite and dissolvable bridge plugs, toe initiation subs, frac sleeves operated by ball drop or coiled tubing, casing isolation/float tools, casing packers, open hole casing packers, casing liner hangers, water bypass subs, crossover subs and perforating tools; Gas lift downhole equipment, namely, packers and bridge plugs; Machines for hydraulic fracturing, namely, composite and dissolvable bridge plugs, setting tools for dissolvable or composite bridge plugs, toe initiation subs, frac sleeves operated by ball drop or coiled tubing, frac balls and darts, open hole casing packers, and perforating tools
  • Class 009 — Scientific and electric apparatus: Electric control devices for managing and controlling completion inflow; surface-controlled sub-surface safety valves for flow shutoff used in substerranean wells

Owner

Prosecution history

  • 27 Nov 2023 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
  • 27 Nov 2023 — ABANDONMENT - NO USE STATEMENT FILED
  • 30 Mar 2023 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 29 Mar 2023 — SOU EXTENSION 5 GRANTED
  • 17 Mar 2023 — SOU EXTENSION 5 FILED
  • 29 Mar 2023 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 17 Mar 2023 — SOU TEAS EXTENSION RECEIVED
  • 22 Oct 2022 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 20 Oct 2022 — SOU EXTENSION 4 GRANTED
  • 20 Oct 2022 — SOU EXTENSION 4 FILED
  • 20 Oct 2022 — SOU TEAS EXTENSION RECEIVED
  • 26 Apr 2022 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 23 Apr 2022 — SOU EXTENSION 3 GRANTED
  • 23 Apr 2022 — SOU EXTENSION 3 FILED
  • 23 Apr 2022 — SOU TEAS EXTENSION RECEIVED

View this trademark record on Marksy