GNAC
Live / Registered — Registered (as of 01 Nov 2022)
What this means for you
Registered since 01 Nov 2022. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 88427199
- Registration number
- 6889939
- Mark type
- Stylized text
- Filed
- 13 May 2019
- Published for opposition
- 14 Jan 2020
- Registered
- 01 Nov 2022
- Attorney of record
- Joseph M. Centofanti
Goods and services
- Class 001 — Chemicals: Chemicals for use in the manufacture of batteries, namely, Lithium Nickel Aluminum Oxides
- Class 009 — Scientific and electric apparatus: Batteries; Batteries and battery chargers; Batteries for vehicles; Batteries, electric; Batteries, electric, for vehicles; Battery boxes; Battery chargers; Battery monitoring devices that may be attached to a battery to monitor the performance of the battery and operating software for use therewith, sold as a unit; Battery monitors; Battery packs; Battery performance monitors; Battery separator films; Battery separators; Battery testers; Anode batteries; Auxiliary battery packs; Car batteries; Chargers for batteries; Chargers for electric batteries; Electric batteries; Electric batteries for powering electric vehicles; Electric storage batteries; Electrical cells and batteries; Electrical storage batteries; Integrated battery backup systems comprising a battery, an electronic measurement apparatus for use in the measurement of battery health and performance, and a remote computer software program that uses the foregoing data to trend, predict, and store data related to the health of the battery; Lithium ion batteries; Mobile telephone batteries; Monitoring devices for monitoring battery performance characteristics; Rechargeable batteries; Rechargeable electric batteries; Renewable battery system to provide backup power
Owner
- CAMX Power LLC, Lexington, MA, US
- CAMX Power LLC, Lexington, MA, US
- CAMX Power LLC, Lexington, MA, US
Prosecution history
- 01 Nov 2022 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
- 01 Nov 2022 — REGISTERED-PRINCIPAL REGISTER
- 27 Sept 2022 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 26 Sept 2022 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 23 Sept 2022 — STATEMENT OF USE PROCESSING COMPLETE
- 08 Sept 2022 — USE AMENDMENT FILED
- 21 Sept 2022 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 08 Sept 2022 — TEAS STATEMENT OF USE RECEIVED
- 11 Mar 2022 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 09 Mar 2022 — SOU EXTENSION 4 GRANTED
- 09 Mar 2022 — SOU EXTENSION 4 FILED
- 09 Mar 2022 — SOU TEAS EXTENSION RECEIVED
- 10 Sept 2021 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 08 Sept 2021 — SOU EXTENSION 3 GRANTED
- 08 Sept 2021 — SOU EXTENSION 3 FILED