SUNER POWER
Dead / Abandoned — Abandoned — after inter partes decision (as of 03 Mar 2020)
What this means for you
This application is over — abandoned 03 Mar 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 88401468
- Mark type
- Design + words
- Filed
- 25 Apr 2019
- Published for opposition
- 29 Oct 2019
- Abandoned
- 03 Mar 2020
Goods and services
- Class 009 — Scientific and electric apparatus: Batteries and battery chargers; Battery chargers; Battery chargers for use with vehicle batteries and mobile phones; Battery jump starters; Inverters; Inverters for power supply; Off-grid power and deep cycle battery storage systems comprised of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixtures for solar, thin-film solar (TFS), vertical axis wind turbine (VAWT) installations; Photovoltaic installation apparatus, namely, solar modules for production of electricity, solar thermal and electric receivers, tracking mechanisms and concentrating optics, and control algorithms; Photovoltaic solar modules for production of electricity; Programmable controllers and actuators that track the sun enabling concentrating optics to maximize solar energy input; Solar-powered battery chargers; Solar-powered rechargeable batteries; Solar panels for production of electricity; Solar panels for the production of electricity; Photovoltaic inverters; Power inverters
Owner
- JUNHUA XIAO, Shenzhen, GuangDong, CN
- JUNHUA XIAO, Shenzhen, GuangDong, CN
Prosecution history
- 03 Mar 2020 — ABANDONMENT NOTICE E-MAILED - INTER PARTES DECISION
- 03 Mar 2020 — ABANDONMENT - AFTER INTER PARTES DECISION
- 03 Mar 2020 — OPPOSITION TERMINATED NO. 999999
- 03 Mar 2020 — OPPOSITION SUSTAINED NO. 999999
- 30 Nov 2019 — OPPOSITION INSTITUTED NO. 999999
- 27 Nov 2019 — OPPOSITION PAPERS RECEIVED AT TTAB
- 29 Oct 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 29 Oct 2019 — PUBLISHED FOR OPPOSITION
- 09 Oct 2019 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 25 Sept 2019 — LETTER OF PROTEST EVIDENCE REVIEWED-NO FURTHER ACTION TAKEN
- 19 Sept 2019 — LETTER OF PROTEST EVIDENCE FORWARDED
- 19 Aug 2019 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 15 Aug 2019 — EXAMINER'S AMENDMENT ENTERED
- 15 Aug 2019 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 15 Aug 2019 — EXAMINERS AMENDMENT E-MAILED