IQWATTS
Dead / Abandoned — Abandoned — no statement of use filed (as of 14 Dec 2020)
What this means for you
This application is over — abandoned 14 Dec 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 88168284
- Mark type
- Stylized text
- Filed
- 24 Oct 2018
- Published for opposition
- 12 Mar 2019
- Abandoned
- 14 Dec 2020
- Attorney of record
- Robert C. Hyta
Goods and services
- Class 009 — Scientific and electric apparatus: Power storage products and equipment, namely, batteries; Battery charge devices, namely, battery charge controllers; Electronic circuits, namely, energy monitoring circuits; Electrical energy conversion products, namely, circuitry for transforming electrical energy stored by a battery into AC power and circuitry for transforming electrical energy provided by an electrical power grid into DC power suitable for storage by a battery; Electrical energy conversion products, namely, circuitry for changing physical characteristics of electrical power signals; Computer software for analysis and control of power systems; Computer software for the management of power systems in the field of demand estimating, generation planning, scheduling generation, and scheduling storage
Owner
- Nextwatts Inc., Spokane, WA, US
- Nextwatts Inc., Spokane, WA, US
Prosecution history
- 14 Dec 2020 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
- 14 Dec 2020 — ABANDONMENT - NO USE STATEMENT FILED
- 09 May 2020 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 07 May 2020 — SOU EXTENSION 2 GRANTED
- 07 May 2020 — SOU EXTENSION 2 FILED
- 07 May 2020 — SOU TEAS EXTENSION RECEIVED
- 08 Nov 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 06 Nov 2019 — SOU EXTENSION 1 GRANTED
- 06 Nov 2019 — SOU EXTENSION 1 FILED
- 06 Nov 2019 — SOU TEAS EXTENSION RECEIVED
- 07 May 2019 — NOA MAILED - SOU REQUIRED FROM APPLICANT
- 12 Mar 2019 — PUBLISHED FOR OPPOSITION
- 20 Feb 2019 — NOTICE OF PUBLICATION
- 31 Jan 2019 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 31 Jan 2019 — ASSIGNED TO EXAMINER