H

Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 26 Jun 2025)

What this means for you

Registered since 17 Dec 2019. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
88128332
Registration number
5939398
Mark type
Design + words
Filed
23 Sept 2018
Published for opposition
05 Mar 2019
Registered
17 Dec 2019
Attorney of record
Matthew Hintz, Esq.

Goods and services

  • Class 006 — Metal goods: Construction elements made of metal namely, metal struts, metal strut channel framing, metal strut framing systems comprised primarily of metal channels, metal channel screws, metal brackets, metal clamps, inserts and fittings, metal channel nuts, rod couplers, lock washers, bolts, seismic rod stiffeners, all-thread rods, channel end caps, metal strut channel and framing accessories, namely, brackets, nuts, washers, fittings, inserts, clamps and end caps; construction elements made of metal, namely, metal supports for supporting pipes, conduits, solar racking, ducts, cable tray systems, rooftop walkways and HVAC systems on rooftops
  • Class 011 — Environmental control apparatus: Heating elements; Hot water heating installations; parts for hot water heating installations, namely, baseboards, fins, baseboard end caps, baseboard corner caps, baseboard brackets, baseboard joiners, expansion tracks, cover extensions, dampers, and heating elements
  • Class 019 — Non-metallic building materials: Non-metal building material, namely, rubber roof-top supports, rubber roof-top supports with attached strut channels, rod clamps or rod extensions, rubber slip sheets for roof-top supports, and rubber pipe hanger supports

Owner

Prosecution history

  • 26 Jun 2025 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
  • 26 Jun 2025 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
  • 26 Jun 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 03 Mar 2025 — TEAS SECTION 8 & 15 RECEIVED
  • 17 Dec 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 17 Dec 2019 — REGISTERED-PRINCIPAL REGISTER
  • 15 Nov 2019 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 14 Nov 2019 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 13 Nov 2019 — STATEMENT OF USE PROCESSING COMPLETE
  • 30 Oct 2019 — USE AMENDMENT FILED
  • 13 Nov 2019 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 30 Oct 2019 — TEAS STATEMENT OF USE RECEIVED
  • 30 Apr 2019 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 05 Mar 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 05 Mar 2019 — PUBLISHED FOR OPPOSITION

View this trademark record on Marksy