WINDRUNNERS
Live / Registered — Registered (as of 07 Jan 2020)
What this means for you
Registered since 07 Jan 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87939694
- Registration number
- 5956504
- Mark type
- Stylized text
- Filed
- 29 May 2018
- Published for opposition
- 09 Apr 2019
- Registered
- 07 Jan 2020
- Attorney of record
- Thomas Dunlap
Goods and services
- Class 037 — Building construction and repair services: Inspection for utility infrastructure, namely, location and placement examination for utility infrastructure and components of that infrastructure being building inspection, and building structural integrity inspection in the course of building construction
- Class 042 — Scientific and technological services: Auditing for utility infrastructure in the nature of location and placement examination for utility infrastructure and components of that infrastructure being safety auditing to improve safety of construction workers on commercial construction sites, inspection for utility infrastructure in the nature of inspection of oil fields, inspection of pipelines for quality control purposes, inspection of power plants and high voltage transmission lines, and mapping services for utility infrastructure
- Class 045 — Legal and security services: Inspection for utility infrastructure, namely, safety inspection services for alternative energy generation power plants
Owner
- Alaska Aerial Survey, LLC, Wasilla, AK, US
- Alaska Aerial Survey, LLC, Wasilla, AK, US
- Alaska Aerial Survey, LLC, Wasilla, AK, US
Prosecution history
- 07 Jan 2025 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 07 Jan 2020 — REGISTERED-PRINCIPAL REGISTER
- 03 Dec 2019 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 30 Nov 2019 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 06 Nov 2019 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 06 Nov 2019 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 05 Nov 2019 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 14 Aug 2019 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 14 Aug 2019 — NON-FINAL ACTION E-MAILED
- 14 Aug 2019 — SU - NON-FINAL ACTION - WRITTEN
- 29 Jul 2019 — STATEMENT OF USE PROCESSING COMPLETE
- 09 Jul 2019 — USE AMENDMENT FILED
- 29 Jul 2019 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 09 Jul 2019 — TEAS STATEMENT OF USE RECEIVED
- 04 Jun 2019 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT