HYDRO-GARD

Dead / Abandoned — Abandoned — failure to respond (as of 01 Oct 2019)

What this means for you

This application is over — abandoned 12 Sept 2019. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
87875169
Mark type
Stylized text
Filed
12 Apr 2018
Abandoned
12 Sept 2019
Attorney of record
James Sakaguchi

Goods and services

  • Class 006 — Metal goods: building materials, namely, building structure waterproofing systems, namely, metal drain traps, metal drain pipes; building components for waterproofing systems, namely, metal drain traps, metal drain pipes; building materials, namely, metal fasteners for installing waterproofing membranes to a building structure, metal injection boxes for installation in walls, floors, and ceilings to distribute waterproofing substances and induction welding discs of metal; metal hoses for injecting waterproofing fillers into walls, floors, and ceilings
  • Class 019 — Non-metallic building materials: building materials, namely, building structure waterproofing systems, namely, waterproofing membranes for roofing, floors and walls, extruded PVC waterstops, high-density polyethylene (HDPE) sheets, sealant tape, liquid flashings, neoprene flashing sheets, fabrics, styrene-butadiene-styrene (SBS) sheets, Chlorosulfonated Polyethelene (CSPE) sheets, coatings, solvents, hardeners, accelerators, joint filling compounds, mortar, resins, polystyrene sheets, primers, adhesives, magnets, welding rods; building components for waterproofing system, namely, waterproofing membranes for roofing, floors and walls, extruded PVC waterstops, high-density polyethylene (HDPE) sheets, sealant tape, liquid flashings, neoprene flashing sheets, fabrics, styrene-butadiene-styrene (SBS) sheets, Chlorosulfonated Polyethelene (CSPE) sheets, coatings, solvents, hardeners, accelerators, joint filling compounds, mortar, resins, polystyrene sheets, primers, adhesives, magnets, welding rods; building materials, namely, waterproofing membranes for roofing, floors, walls, swelling geotextile mats for waterproofing buildings, non-metal filter mats for use as a waterproofing floor underlayment, non-metal waterproofing drainage boards and panels, non-metal water barriers in the nature of  waterproofing membranes for roofing, floors and walls, extruded PVC waterstops, high-density polyethylene (HDPE) sheets, sealant tape, liquid flashings, neoprene flashing sheets, fabrics, styrene-butadiene-styrene (SBS) sheets, Chlorosulfonated Polyethelene (CSPE) sheets, coatings, solvents, hardeners, accelerators, joint filling compounds, mortar, resins, polystyrene sheets, primers, adhesives, magnets, welding rods;, non-metal water stops in the nature of waterproofing membranes for roofing, floors and walls, extruded PVC waterstops, high-density polyethylene (HDPE) sheets, sealant tape, liquid flashings, neoprene flashing sheets, fabrics, styrene-butadiene-styrene (SBS) sheets, Chlorosulfonated Polyethelene (CSPE) sheets, coatings, solvents, hardeners, accelerators, joint filling compounds, mortar, resins, polystyrene sheets, primers, adhesives, magnets, welding rods; non-metal fasteners for installing waterproofing membranes to a building structure, joint grouting, sealer resins in the nature of concreate floor sealers, sealer hardeners in the nature of concreate floor sealers, sealer fillers in the nature of concreate floor sealers, injection grouts; non-metal hoses for injecting waterproofing fillers into walls, floors, and ceilings; tape for sealing joints in drywall, wallboard, and pipes

Owner

Prosecution history

  • 01 Oct 2019 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
  • 01 Oct 2019 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
  • 11 Mar 2019 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 11 Mar 2019 — FINAL REFUSAL E-MAILED
  • 11 Mar 2019 — FINAL REFUSAL WRITTEN
  • 02 Feb 2019 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 01 Feb 2019 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 01 Feb 2019 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 01 Aug 2018 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 01 Aug 2018 — NON-FINAL ACTION E-MAILED
  • 01 Aug 2018 — NON-FINAL ACTION WRITTEN
  • 31 Jul 2018 — ASSIGNED TO EXAMINER
  • 21 Apr 2018 — NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
  • 16 Apr 2018 — NEW APPLICATION ENTERED

View this trademark record on Marksy