APACHE PRIDE

Live / Registered — Registered (as of 07 Mar 2023)

What this means for you

Registered since 07 Mar 2023. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
87821077
Registration number
6994018
Mark type
Stylized text
Filed
05 Mar 2018
Published for opposition
20 Dec 2022
Registered
07 Mar 2023
Attorney of record
Ari Pramudji

Goods and services

  • Class 037 — Building construction and repair services: Industrial services for construction in the nature of application of industrial coatings; Industrial services for construction in the nature of fireproofing, namely the application of fireproof paints, fireproof cement coatings, and fireproof seals; Industrial services for construction in the nature of painting of industrial products; Industrial services for construction in the nature of industrial refractory services, namely the installation and repair of industrial furnaces, incinerators, and boilers; Industrial services for construction in the nature of scaffolding, namely installation and subsequent removal of building scaffolds; Industrial services for construction in the nature of providing forming and shoring systems, namely the installation and subsequent removal and rental of forming and shoring systems; Installation of insulating materials; Lead abatement services, namely, hazardous lead waste clean-up services
  • Class 040 — Treatment of materials: Abrasive blasting services; Metallizing; Lead abatement services, namely, hazardous lead waste treatment services

Owner

Prosecution history

  • 07 Mar 2023 — NOTICE OF REGISTRATION CONFIRMATION EMAILED
  • 07 Mar 2023 — REGISTERED-PRINCIPAL REGISTER
  • 20 Dec 2022 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 20 Dec 2022 — PUBLISHED FOR OPPOSITION
  • 30 Nov 2022 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 15 Nov 2022 — APPROVED FOR PUB - PRINCIPAL REGISTER
  • 11 Nov 2022 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 11 Nov 2022 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 11 Nov 2022 — TEAS REQUEST FOR RECONSIDERATION RECEIVED
  • 29 Aug 2022 — NOTIFICATION OF FINAL REFUSAL EMAILED
  • 29 Aug 2022 — FINAL REFUSAL E-MAILED
  • 29 Aug 2022 — FINAL REFUSAL WRITTEN
  • 16 Jul 2022 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
  • 15 Jul 2022 — SUSPENSION CHECKED - TO ATTORNEY FOR ACTION
  • 02 Jan 2022 — REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED

View this trademark record on Marksy