THE IMMERSION COOLING AUTHORITY
Live / Registered — Registered (as of 31 Mar 2020)
What this means for you
Registered since 31 Mar 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87743295
- Registration number
- 6024633
- Mark type
- Stylized text
- Filed
- 04 Jan 2018
- Published for opposition
- 12 Jun 2018
- Registered
- 31 Mar 2020
- Attorney of record
- Andre Brunel
Goods and services
- Class 009 — Scientific and electric apparatus: Computer chassis with energy-saving features; modular racks in the nature of mounting racks for computer hardware, filled with mineral oil blend for cooling computer equipment
- Class 011 — Environmental control apparatus: Modular racks in the nature of cooling installations for computer equipment, filled with a dielectric liquid for cooling computer equipment; liquid immersion cooling systems for data center servers; cooling systems, namely, liquid immersion system for use inside modular racks for cooling computer equipment; cooling systems for distributing a dielectric coolant to computer equipment and other devices that generate heat; cooling systems in the nature of liquid cooling apparatus and cooling installations for cooling server racks, for server racks, data centers and computer rooms; modular cooling distribution systems in the nature of cooling installations comprised primarily of a rack filled with dielectric liquid for cooling computer equipment, a pump module in the nature of a heat pump, and an evaporative water cooling tower and also consisting of data center infrastructure management and control systems in the nature of computer hardware and software for controlling the temperature and environmental conditions of data centers and cooling equipment for data centers
Owner
- Green Revolution Cooling, Inc., Austin, TX, US
- Green Revolution Cooling, Inc., Austin, TX, US
- Green Revolution Cooling, Inc., Austin, TX, US
Prosecution history
- 31 Mar 2025 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 31 Mar 2020 — REGISTERED-PRINCIPAL REGISTER
- 27 Feb 2020 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 26 Feb 2020 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 26 Feb 2020 — STATEMENT OF USE PROCESSING COMPLETE
- 06 Feb 2020 — USE AMENDMENT FILED
- 26 Feb 2020 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 06 Feb 2020 — TEAS STATEMENT OF USE RECEIVED
- 02 Aug 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 31 Jul 2019 — SOU EXTENSION 2 GRANTED
- 31 Jul 2019 — SOU EXTENSION 2 FILED
- 31 Jul 2019 — SOU TEAS EXTENSION RECEIVED
- 06 Feb 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 04 Feb 2019 — SOU EXTENSION 1 GRANTED
- 04 Feb 2019 — SOU EXTENSION 1 FILED