ECOLON
Dead / Abandoned — Abandoned — failure to respond (as of 23 Mar 2020)
What this means for you
This application is over — abandoned 03 Mar 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 87739000
- Mark type
- Design + words
- Filed
- 30 Dec 2017
- Published for opposition
- 27 Nov 2018
- Abandoned
- 03 Mar 2020
Goods and services
- Class 017 — Rubber goods: Caulking; Caulking compounds; Caulking materials; Insulating materials; Insulators for cables; Insulators for electrical cables; Packing materials of rubber or plastics; Reinforcing materials not of metal for pipes; Sealant compounds for joints; Soundproofing materials; Stuffing of rubber or plastic; Tubing consisting of plastic films for rehabilitating pipelines and plumbing systems; Adhesive sealant and caulking compound; Flexible tubes of plastic; Insulation materials, namely, composite sheets and panels comprising a reinforced cement core mechanically bonded to steel sheets on both outer surfaces for use in barriers, doors, ducts and ceilings; Insulation materials, namely, fire-resistant doors comprised of reinforced cement and steel; Insulation products, namely, blast-resistant doors comprised of reinforced cement and steel; Interior linings made of non-metal fabric and sealant for the repair of electrical, telecommunication and natural gas utility conduits and pipes; Plastic composite material in the form of profiles, boards, sheets, blocks, rods, powder, and pellets for use in manufacturing; Rubber sealant for caulking and adhesive purposes; Weatherstripping sealants in the nature of caulk
Owner
- Shanghai PRET Composites CO., LTD., Shanghai, CN
- Shanghai PRET Composites CO., LTD., Shanghai, CN
- WELLMAN ADVANCED MATERIALS, LLC, Johnsonville, SC, US
- WELLMAN ADVANCED MATERIALS, LLC, Johnsonville, SC, US
Prosecution history
- 23 Mar 2020 — ABANDONMENT NOTICE E-MAILED - FAILURE TO RESPOND
- 23 Mar 2020 — ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
- 29 Aug 2019 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 29 Aug 2019 — NON-FINAL ACTION E-MAILED
- 29 Aug 2019 — SU - NON-FINAL ACTION - WRITTEN
- 16 Aug 2019 — STATEMENT OF USE PROCESSING COMPLETE
- 22 Jul 2019 — USE AMENDMENT FILED
- 14 Aug 2019 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 22 Jul 2019 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 22 Jul 2019 — TEAS STATEMENT OF USE RECEIVED
- 22 Jan 2019 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 27 Nov 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 27 Nov 2018 — PUBLISHED FOR OPPOSITION
- 07 Nov 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 17 Oct 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER