COR-TUF
Live / Registered — Registered — Section 8 accepted (as of 06 Mar 2025)
What this means for you
Registered since 11 Jun 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87654693
- Registration number
- 5776422
- Mark type
- Stylized text
- Filed
- 21 Oct 2017
- Published for opposition
- 14 Aug 2018
- Registered
- 11 Jun 2019
- Attorney of record
- Todd Juneau
Goods and services
- Class 019 — Non-metallic building materials: Concrete; concrete beams; concrete building materials, namely, panels; concrete fencing in the nature of a noise barrier; concrete floors; concrete mix; concrete panels; concrete pipes; concrete retaining walls; concrete walls; concrete walls for building; building materials, namely, pre-cast concrete wall forms; construction materials in the nature of non-metal composite panels composed primarily of concrete; construction materials namely, energy conserving precast concrete slabs; construction materials, namely, concrete slabs designed to increase energy efficiency and energy conservation; industrial concrete for use in civil engineering works [ ; offshore drilling platforms made primarily of concrete; self-leveling concrete for use in building construction ]
Owner
- INTEGRATED COMPOSITE CONSTRUCTION SYSTEMS, LLC, Fort Collins, CO, US
- Darling, Douglas E., Culpeper, VA, US
- Darling, Douglas E., Culpeper, VA, US
- Darling, Douglas E., Culpeper, VA, US
Prosecution history
- 06 Mar 2025 — NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED
- 06 Mar 2025 — REGISTERED - SEC. 8 (6-YR) ACCEPTED
- 10 Feb 2025 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 10 Feb 2025 — OFFICE ACTION ISSUED POU2
- 24 Oct 2024 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 23 Aug 2024 — OFFICE ACTION ISSUED POU1
- 23 Aug 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 11 Jun 2024 — TEAS SECTION 15 RECEIVED
- 11 Jun 2024 — TEAS SECTION 8 RECEIVED
- 11 Jun 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 29 Jun 2022 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 11 Jun 2019 — REGISTERED-PRINCIPAL REGISTER
- 07 May 2019 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 06 May 2019 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 17 Apr 2019 — STATEMENT OF USE PROCESSING COMPLETE