GREENNET
Dead / Cancelled — Cancelled — Section 8 (as of 14 Mar 2025)
What this means for you
This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 87647459
- Registration number
- 5553464
- Mark type
- Stylized text
- Filed
- 16 Oct 2017
- Published for opposition
- 19 Jun 2018
- Registered
- 04 Sept 2018
Goods and services
- Class 042 — Scientific and technological services: Computer services, namely, providing temporary use of non-downloadable computer software to upload and access results from diagnostic tests performed by participating HVAC, electrical, and plumbing contractors; computer services, namely, providing temporary use of non-downloadable computer software for the collection and transmission of diagnostic data collected from meters, HVAC equipment, thermostats, lights, cameras and sensors; data automation and collection services using proprietary software to evaluate, analyze, and collect service data in the energy, water, and gas industries, and solar electrical vehicle industry; computer services, namely, providing a website featuring demand response collection and control of HVAC and electrical equipment and collection of related energy savings and time of use data
- Class 045 — Legal and security services: on-line permitting, namely, obtaining governmental permits for the purpose of satisfying residential and commercial codes for constructing buildings, electrical, plumbing, mechanical, HVAC, and solar panel installations, and constructing electrical power stations and electrical connections
Owner
- Energy Cloud Inc., San Diego, CA, US
- Energy Cloud Inc., San Diego, CA, US
- Energy Cloud Inc., San Diego, CA, US
Prosecution history
- 14 Mar 2025 — CANCELLED SEC. 8 (6-YR)
- 04 Sept 2023 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 04 Sept 2018 — REGISTERED-PRINCIPAL REGISTER
- 10 Aug 2018 — ASSIGNED TO EXAMINER
- 19 Jun 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 19 Jun 2018 — PUBLISHED FOR OPPOSITION
- 30 May 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 11 May 2018 — LAW OFFICE PUBLICATION REVIEW COMPLETED
- 09 May 2018 — ASSIGNED TO LIE
- 30 Apr 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 25 Apr 2018 — TEAS/EMAIL CORRESPONDENCE ENTERED
- 24 Apr 2018 — CORRESPONDENCE RECEIVED IN LAW OFFICE
- 24 Apr 2018 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
- 23 Apr 2018 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
- 23 Apr 2018 — NON-FINAL ACTION E-MAILED