NIWA-QA

Dead / Cancelled — Cancelled — Section 8 (as of 25 Jul 2025)

What this means for you

This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
87642947
Registration number
5652554
Mark type
Stylized text
Filed
12 Oct 2017
Published for opposition
30 Oct 2018
Registered
15 Jan 2019
Attorney of record
Bassam N. Ibrahim

Goods and services

  • Class 006 — Metal goods: Metal materials for building or construction, namely, metal pipes and metal tubes, metal pipe connectors, metal partitions for building; Metal hardware, namely, metal screws, nuts, bolts, metal brackets for use in the construction and assembly of decking; Metal joinery fittings; Pre-fabricated building assembly kits of metal
  • Class 037 — Building construction and repair services: Construction of buildings, namely, offices, residential facilities, retail stores, warehouse distribution centers, warehouse stores, accommodation facilities and restaurant facilities; Advisory services relating to the construction, namely, construction consultancy; Building construction services involving the operation of building equipment for others; Maintenance of building equipment for others
  • Class 042 — Scientific and technological services: Architectural design services; Surveying service; Research on building construction or city planning

Owner

Prosecution history

  • 25 Jul 2025 — CANCELLED SEC. 8 (6-YR)
  • 15 Jan 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 15 Mar 2019 — REGISTERED - SEC. 7 REQUEST ABANDONED
  • 11 Mar 2019 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
  • 07 Mar 2019 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 29 Jan 2019 — TEAS SECTION 7 REQUEST RECEIVED
  • 15 Jan 2019 — REGISTERED-PRINCIPAL REGISTER
  • 30 Oct 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 30 Oct 2018 — PUBLISHED FOR OPPOSITION
  • 10 Oct 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 24 Sept 2018 — 1(B) BASIS DELETED; NEW BASIS REQUESTED
  • 05 Sept 2018 — NOTICE OF ALLOWANCE CANCELLED
  • 14 Sept 2018 — ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED
  • 14 Sept 2018 — PETITION TO DIRECTOR - CHANGE BASIS - GRANTED
  • 12 Sept 2018 — ASSIGNED TO PETITION STAFF

View this trademark record on Marksy