NIPANDER
Live / Registered — Registered (as of 08 Sept 2020)
What this means for you
Registered since 08 Sept 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87255472
- Registration number
- 6147720
- Mark type
- Stylized text
- Filed
- 02 Dec 2016
- Published for opposition
- 09 May 2017
- Registered
- 08 Sept 2020
- Attorney of record
- Robin L. Barnes
Goods and services
- Class 037 — Building construction and repair services: Construction of structures for natural gas production in the gas industry; construction of structures for gas processing facilities in the gas industry; construction project management services in the field of construction of gas processing facilities; technical consulting related to the installation of natural gas and hydrocarbon processing equipment, control systems, and machinery
- Class 040 — Treatment of materials: Custom fabrication and production of natural gas and hydrocarbon processing equipment and machinery; assembly of oil and gas industrial machines for others; technical consulting relating to the manufacture of oil and gas equipment, control systems and machinery; fuel refining, namely, natural gas liquefaction services
Owner
- Butts Properties, Ltd., Midland, TX, US
- Butts Properties, Ltd., Midland, TX, US
- Butts Properties, Ltd., Midland, TX, US
Prosecution history
- 08 Sept 2025 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 08 Sept 2020 — REGISTERED-PRINCIPAL REGISTER
- 07 Aug 2020 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 06 Aug 2020 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 26 Jun 2020 — STATEMENT OF USE PROCESSING COMPLETE
- 19 Jun 2020 — USE AMENDMENT FILED
- 19 Jun 2020 — TEAS STATEMENT OF USE RECEIVED
- 11 Dec 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 10 Dec 2019 — SOU EXTENSION 5 GRANTED
- 05 Dec 2019 — SOU EXTENSION 5 FILED
- 09 Dec 2019 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 05 Dec 2019 — SOU TEAS EXTENSION RECEIVED
- 15 Jun 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 13 Jun 2019 — SOU EXTENSION 4 GRANTED
- 13 Jun 2019 — SOU EXTENSION 4 FILED