BLASTECH
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 03 Apr 2025)
What this means for you
Registered since 22 Jan 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87253490
- Registration number
- 5662007
- Mark type
- Stylized text
- Filed
- 01 Dec 2016
- Published for opposition
- 27 Mar 2018
- Registered
- 22 Jan 2019
- Attorney of record
- John Ross Flynt
Goods and services
- Class 037 — Building construction and repair services: The repair, maintenance, and coating for corrosion resistance, namely, with spray and liquid coatings, of industrial metal structures and rail cars
- Class 040 — Treatment of materials: The treatment of materials in industrial applications and rail cars for surface preparation and protection against corrosion with abrasive blasting, namely, shot blasting, sandblasting, and media blasting, namely, with media such as white sand, coal slag, nickel slag, copper slag, aluminum oxide, glass, garnet, and walnut shells, metalizing, applying internal linings, namely, through spraying, and priming metal, namely, through spraying
Owner
- T.F. Warren Group Corporation, Spring, TX, US
- T.F. Warren Group Corporation, The Woodlands, TX, US
- T.F. Warren Group Corporation, The Woodlands, TX, US
Prosecution history
- 03 Apr 2025 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 03 Apr 2025 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 03 Apr 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 17 Dec 2024 — TEAS SECTION 8 & 15 RECEIVED
- 11 Apr 2024 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 11 Apr 2024 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 11 Apr 2024 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 11 Apr 2024 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 11 Apr 2024 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 22 Jan 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 22 Jan 2019 — REGISTERED-PRINCIPAL REGISTER
- 10 Jan 2019 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 19 Dec 2018 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 18 Dec 2018 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 04 Dec 2018 — STATEMENT OF USE PROCESSING COMPLETE