BLASTCO
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 16 Mar 2026)
What this means for you
Registered since 11 Feb 2020. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87253489
- Registration number
- 5984744
- Mark type
- Stylized text
- Filed
- 01 Dec 2016
- Published for opposition
- 23 Apr 2019
- Registered
- 11 Feb 2020
- Attorney of record
- Corey Tumey
Goods and services
- Class 037 — Building construction and repair services: The repair, maintenance, and coating for enhancing fire-retardancy, corrosion resistance, and chemical resistance, namely, with spray and liquid coatings, of storage tanks, bridges, and high temperature furnace units for commercial, industrial, and agricultural use and lead abatement services, namely, hazardous waste cleanup services
- Class 040 — Treatment of materials: Application of abrasive blastings, namely, shot blasting, sandblasting, and media blasting, namely, with media such as white sand, coal slag, nickel slag, copper slag, aluminum oxide, glass, garnet, and walnut shells and coatings for storage tanks, bridges, and high temperature furnace units for surface preparation
Owner
- T.F. Warren Group Corporation, Spring, TX, US
- T.F. Warren Group Corporation, The Woodlands, TX, US
- T.F. Warren Group Corporation, The Woodlands, TX, US
Prosecution history
- 16 Mar 2026 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 16 Mar 2026 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 16 Mar 2026 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 10 Dec 2025 — TEAS SECTION 8 & 15 RECEIVED
- 11 Feb 2025 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 11 Apr 2024 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 11 Apr 2024 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 11 Apr 2024 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 11 Apr 2024 — APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
- 11 Apr 2024 — TEAS CHANGE OF OWNER ADDRESS RECEIVED
- 11 Feb 2020 — REGISTERED-PRINCIPAL REGISTER
- 07 Jan 2020 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 06 Jan 2020 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 16 Dec 2019 — STATEMENT OF USE PROCESSING COMPLETE
- 11 Dec 2019 — USE AMENDMENT FILED