SILICONRAIL
Dead / Cancelled — Cancelled — Section 8 (as of 17 May 2024)
What this means for you
This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 87214443
- Registration number
- 5331178
- Mark type
- Design + words
- Filed
- 25 Oct 2016
- Published for opposition
- 21 Mar 2017
- Registered
- 07 Nov 2017
Goods and services
- Class 009 — Scientific and electric apparatus: Automated process control system comprised of logic based hardware used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation, electrical distribution and oil and gas processing; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated systems, namely, software, hardware and communications devices for planning, scheduling, controlling, monitoring and providing information on transportation assets and parts thereof; Automated debris management system software for use in cleaning up after major disasters; Automated process control system comprised of logic based hardware used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial machinery, namely, turbines, generators and compressors; Automated process control system, namely, micro-processor based hardware and software used to monitor the status of industrial processes, namely, power generation, electrical distribution and oil and gas processing; Building security systems comprising software and hardware for providing picture, video, alarm status, building plans, and other information to a remote station; CAD/CAM software for the design of machineries; Downloadable computer game software via a global computer network and wireless devices; Electronic systems for recording and automated playback of acoustic pianos; Environmentally friendly automation systems, namely, embedded operating systems and pc based software, for monitoring specified conditions and controlling respective innovative devices within a designated area; Facilities management software, namely, software to control building environment, access and security systems; Games that accept virtual or monetary wagers sold as a feature of game software; Hardened units composed of microprocessors and integrated transmitters and receivers installed in the field, affixed to equipment, or worn by personnel at large scale mining, construction, and industrial sites to transmit telemetry data on equipment and personnel to central processing facilities and to receive automated proximity alerts of other equipment or personnel for operations and safety management systems; Home and office electrical power automation systems comprising wireless and wired controllers, controlled devices, and software for appliances, lighting, HVAC, security and other home and office electrical power monitoring and control applications; Impact simulation test equipment in the nature of crash test dummies, crash barriers and crash tracks; Software for monitoring and controlling communication between computers and automated machine systems; Video injection system, namely, optical and electronic hardware and computer software, simulating the effects of tracer round fly-outs and bursts on target, which allows for on-vehicle precision gunnery without expending actual ammunition
Owner
- JAVIER SOBRERO, Cordoba, AR
- JAVIER SOBRERO, Cordoba, AR
- JAVIER SOBRERO, Cordoba, AR
Prosecution history
- 17 May 2024 — CANCELLED SEC. 8 (6-YR)
- 07 Nov 2022 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 07 Nov 2017 — REGISTERED-PRINCIPAL REGISTER
- 03 Oct 2017 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 30 Sept 2017 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 16 Sept 2017 — STATEMENT OF USE PROCESSING COMPLETE
- 30 Aug 2017 — USE AMENDMENT FILED
- 16 Sept 2017 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 30 Aug 2017 — TEAS STATEMENT OF USE RECEIVED
- 16 May 2017 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 21 Mar 2017 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 21 Mar 2017 — PUBLISHED FOR OPPOSITION
- 01 Mar 2017 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 07 Feb 2017 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 06 Feb 2017 — TEAS/EMAIL CORRESPONDENCE ENTERED