FLOW RIGHT
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 08 Aug 2023)
What this means for you
Registered since 17 Oct 2017. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 87156044
- Registration number
- 5313149
- Mark type
- Design + words
- Filed
- 30 Aug 2016
- Published for opposition
- 31 Jan 2017
- Registered
- 17 Oct 2017
- Attorney of record
- Catherine A. Cavella
Goods and services
- Class 037 — Building construction and repair services: Heating equipment installation and repair; Installation and maintenance of irrigation systems; Installation and repair of air conditioning apparatus; Installation and repair of freezing apparatus; Installation and repair of heating, ventilating and air conditioning equipment; Installation and replacement service for heating, ventilating and air conditioning systems; Installation and replacement service for water heaters; Installation, repair and maintenance of heating equipment; Air conditioning apparatus installation and repair; Emergency road side repair services; Freezing equipment installation and repair; Furnace installation and repair; Installation, repair and replacement of heating, cooling, refrigeration and ventilation equipment; Irrigation devices installation and repair; Maintenance and repair of heating installations; Plumbing and gas and water installation
Owner
- FLOW RIGHT PLUMBING, HEATING AND IRRIGATION, INC., Pueblo, CO, US
- FLOW RIGHT PLUMBING, HEATING AND IRRIGATION, INC., Pueblo, CO, US
- FLOW RIGHT PLUMBING, HEATING AND IRRIGATION, INC., Pueblo, CO, US
Prior registrations
Prosecution history
- 08 Aug 2023 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 08 Aug 2023 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 08 Aug 2023 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 09 Feb 2023 — TEAS SECTION 8 & 15 RECEIVED
- 17 Oct 2022 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 17 Oct 2017 — REGISTERED-PRINCIPAL REGISTER
- 15 Sept 2017 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 14 Sept 2017 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 12 Sept 2017 — STATEMENT OF USE PROCESSING COMPLETE
- 23 Aug 2017 — USE AMENDMENT FILED
- 12 Sept 2017 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 23 Aug 2017 — TEAS STATEMENT OF USE RECEIVED
- 23 Aug 2017 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 28 Mar 2017 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 31 Jan 2017 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED