GRID IN A BOX
Dead / Abandoned — Abandoned — no statement of use filed (as of 29 Jun 2020)
What this means for you
This application is over — abandoned 29 Jun 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 87154865
- Mark type
- Stylized text
- Filed
- 30 Aug 2016
- Published for opposition
- 28 Mar 2017
- Abandoned
- 29 Jun 2020
- Attorney of record
- William B. Nash
Goods and services
- Class 009 — Scientific and electric apparatus: Array of power generation and distribution equipment, sold as a unit, pre-equipped for deployment to remote locations; Integrated electrical energy storage system comprised of batteries and battery management systems; DC/AC power converters; electrical distribution systems, namely, power distribution panels; electrical power distribution units; electrical controllers for use with power converters; electrical controllers used to reduce power consumption; microprocessors used to reduce power consumption; power controllers; power distributing boxes; power inverters; power line conditioners; power supplies; renewable battery system to provide backup power; battery storage systems composed of batteries, chargers and inverters; voltage regulators for electric power; voltage stabilizing power supply
Owner
- OCI Enterprises Inc., San Antonio, TX, US
- OCI Enterprises Inc., San Antonio, TX, US
Prosecution history
- 29 Jun 2020 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
- 29 Jun 2020 — ABANDONMENT - NO USE STATEMENT FILED
- 06 Feb 2020 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 06 Feb 2020 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 17 Oct 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 16 Oct 2019 — SOU EXTENSION 5 GRANTED
- 10 Oct 2019 — SOU EXTENSION 5 FILED
- 16 Oct 2019 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 10 Oct 2019 — SOU TEAS EXTENSION RECEIVED
- 04 May 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 02 May 2019 — SOU EXTENSION 4 GRANTED
- 02 May 2019 — SOU EXTENSION 4 FILED
- 02 May 2019 — SOU TEAS EXTENSION RECEIVED
- 01 Nov 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 30 Oct 2018 — SOU EXTENSION 3 GRANTED