CENTRICVIEW

Dead / Cancelled — Cancelled — Section 8 (as of 29 Aug 2025)

What this means for you

This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
87105661
Registration number
5681029
Mark type
Design + words
Filed
15 Jul 2016
Published for opposition
09 May 2017
Registered
19 Feb 2019
Attorney of record
Laura M. Franco

Goods and services

  • Class 009 — Scientific and electric apparatus: downloadable software, namely, mobile applications for monitoring, recording, auditing, testing, analyzing, troubleshooting, measurements and reporting of operational parameters, namely, signal level, signal quality, bandwidth used, data packet loss, temperature, flow, pressure, motion, location and status of communications networks and equipment in the nature of wireless, wired, and satellite communications modems, routers, switches, antennas and sensors in the energy and maritime industries, all of the foregoing excluding equipment relating to photovoltaic solar systems; downloadable software, namely, mobile applications for monitoring, recording, auditing, testing, analyzing, troubleshooting, measurement and reporting of data generated by equipment used in the energy and maritime industries, namely, wireless, wired, and satellite communications modems, routers, switches, antennas and sensors, all of the foregoing excluding equipment relating to photovoltaic solar systems
  • Class 042 — Scientific and technological services: providing temporary use of non-downloadable computer software platforms for monitoring, recording, auditing, testing, analyzing, troubleshooting, measurement and reporting of operational parameters, namely, signal level, signal quality, bandwidth used, data packet loss, temperature, flow, pressure, motion, location and status of communications networks and equipment used in the energy and maritime industries, all of the foregoing excluding equipment relating to photovoltaic solar systems; platform as a service (PAAS) services featuring computer software platforms for monitoring, recording, auditing, testing, analyzing, troubleshooting, measurement and reporting of operational parameters, namely, signal level, signal quality, bandwidth used, data packet loss, temperature, flow, pressure, motion, location and status of communications networks and equipment in the nature of wireless, wired, and satellite communications modems, routers, switches, antennas and sensors in the energy and maritime industries, all of the foregoing excluding equipment relating to photovoltaic solar systems; platform as a service (PAAS) services featuring computer software platforms for monitoring, recording, auditing, testing, analyzing, troubleshooting, measurement and reporting of data communications networks and equipment in the energy and maritime industries, namely, wireless, wired, and satellite communications modems, routers, switches, antennas and sensors, all of the foregoing excluding equipment relating to photovoltaic solar systems; consulting services in the field of computer software for monitoring communications networks and equipment, excluding equipment related to photovoltaic solar systems, in the energy and maritime industries; technical support services in the nature of troubleshooting problems with communications network hardware and software, excluding networks related to photovoltaic solar systems

Owner

Prosecution history

  • 29 Aug 2025 — CANCELLED SEC. 8 (6-YR)
  • 19 Feb 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 19 Feb 2019 — REGISTERED-PRINCIPAL REGISTER
  • 18 Jan 2019 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 17 Jan 2019 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 16 Jan 2019 — TEAS/EMAIL CORRESPONDENCE ENTERED
  • 15 Jan 2019 — CORRESPONDENCE RECEIVED IN LAW OFFICE
  • 15 Jan 2019 — TEAS RESPONSE TO OFFICE ACTION RECEIVED
  • 15 Oct 2018 — NOTIFICATION OF NON-FINAL ACTION E-MAILED
  • 15 Oct 2018 — NON-FINAL ACTION E-MAILED
  • 15 Oct 2018 — SU - NON-FINAL ACTION - WRITTEN
  • 26 Sept 2018 — STATEMENT OF USE PROCESSING COMPLETE
  • 26 Jun 2018 — USE AMENDMENT FILED
  • 03 Jul 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 02 Jul 2018 — SOU EXTENSION 2 GRANTED

View this trademark record on Marksy