COREGASIFICATION TECHNOLOGY
Dead / Cancelled — Cancelled — Section 8 (as of 11 Jul 2025)
What this means for you
This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 87093358
- Registration number
- 5640194
- Mark type
- Design + words
- Filed
- 05 Jul 2016
- Published for opposition
- 16 Oct 2018
- Registered
- 01 Jan 2019
- Attorney of record
- Howard N. Aronson
Goods and services
- Class 007 — Machines and machine tools: Chemical processing machines, namely, separating machines, dissolving machines, grinding mills, and sorting machines; Non-electric prime movers not for land vehicles, namely, grapple buckets, blades for moving earth and loose objects and parts thereof; Gas turbines, not for land vehicles, other than water mills and wind mills; Steam turbines, not for land vehicles, other than water mills and wind mills; Starters for motors and engines; AC motors and DC motors not including those for land vehicles but including structural and replacement parts for any AC motors and DC motors; AC generators in the nature of alternators; Direct current generators
- Class 011 — Environmental control apparatus: Drying apparatus for chemical processing; Recuperators for chemical processing; Steamers for chemical processing; Evaporators for chemical processing; Distillers for chemical processing; Heat exchangers for chemical processing; Gas purifying installations; Industrial furnaces; Nuclear reactors in the nature of atomic piles; Gasification furnace; Industrial boilers other than parts of prime movers and other than parts of engines
- Class 037 — Building construction and repair services: Construction of power-generating plants; Construction of buildings; Construction of facilities, structures, living quarters, and utility buildings, production modules and subsea modules in the oil and gas industry; Construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Repair or maintenance of air-conditioning apparatus for industrial purposes; Repair or maintenance of burners; Repair or maintenance of boilers; Repair or maintenance of pumps; Repair or maintenance of freezing machines and apparatus; Repair or maintenance of power distribution or control machines and apparatus; Repair or maintenance of power generators; Repair or maintenance of electric motors; Repair or maintenance of chemical processing machines and apparatus; Repair or maintenance of industrial furnaces; Repair or maintenance of gasification furnace; Repair or maintenance of nuclear power plants; Repair or maintenance of chemical plants; Repair, maintenance or servicing of power plants
- Class 042 — Scientific and technological services: Designing of machines, apparatus, instruments including their parts or systems composed of such machines, apparatus and instruments; Research on building construction or city planning; Testing or research on prevention of pollution; Testing or research on electricity; Testing or research on civil engineering; Testing the functionality of machines, apparatus and instruments; research on machines, apparatus and instruments; Providing technology information and operation data analysis of power plants for testing or research on electricity or testing or research on machines, apparatus and instruments; Monitoring of building equipment operation by remote access
Owner
- MITSUBISHI POWER, LTD., YOKOHAMA-SHI, KANAGAWA, JP
- Mitsubishi Hitachi Power Systems, Ltd., Yokohama-shi, Kanagawa, JP
- Mitsubishi Hitachi Power Systems, Ltd., Yokohama-shi, Kanagawa, JP
- Mitsubishi Hitachi Power Systems, Ltd., Yokohama-shi, Kanagawa, JP
Prosecution history
- 11 Jul 2025 — CANCELLED SEC. 8 (6-YR)
- 01 Jan 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 30 Dec 2020 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 01 Jan 2019 — REGISTERED-PRINCIPAL REGISTER
- 16 Oct 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
- 16 Oct 2018 — PUBLISHED FOR OPPOSITION
- 26 Sept 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
- 12 Sept 2018 — LAW OFFICE PUBLICATION REVIEW COMPLETED
- 05 Sept 2018 — ASSIGNED TO LIE
- 27 Aug 2018 — ASSIGNED TO LIE
- 21 Aug 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER
- 21 Aug 2018 — EXAMINER'S AMENDMENT ENTERED
- 21 Aug 2018 — NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
- 21 Aug 2018 — EXAMINERS AMENDMENT E-MAILED
- 21 Aug 2018 — EXAMINERS AMENDMENT -WRITTEN