POWERAHEAD
Dead / Cancelled — Cancelled — Section 8 (as of 26 Dec 2025)
What this means for you
This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 86931058
- Registration number
- 5775871
- Mark type
- Stylized text
- Filed
- 07 Mar 2016
- Published for opposition
- 25 Jul 2017
- Registered
- 11 Jun 2019
- Attorney of record
- Lynn E. Rzonca
Goods and services
- Class 037 — Building construction and repair services: Maintenance and repair of public utility equipment for the purposes of making the equipment more resilient and less susceptible to storm damage to enable continued operation despite damage and enable a rapid return to normal operations when damage does occur
- Class 039 — Transportation and storage services: Providing real-time public utility service information for the purpose of averting outages; Public utility services in the nature of electricity transmission and distribution via intelligent computer systems that can adjust to changing conditions automatically
- Class 042 — Scientific and technological services: Remote monitoring of the functioning and use of critical devices, namely, electrical power generation and transmission apparatus, generators, transmission towers for faster restoration of power; Design and development of intelligent computer systems that can adjust to public utility outage conditions automatically; Design and development of public utility equipment that is more resilient and less susceptible to storm damage to enable continued operation despite damage and enable a rapid return to normal operations when damage does occur
Owner
- PEPCO HOLDINGS LLC, WASHINGTON, DC, US
- PEPCO HOLDINGS LLC, WASHINGTON, DC, US
- PEPCO HOLDINGS LLC, WASHINGTON, DC, US
- Pepco Holdings, Inc., Washington, DC, US
Prosecution history
- 26 Dec 2025 — CANCELLED SEC. 8 (6-YR)
- 11 Jun 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 11 Jun 2019 — REGISTERED-PRINCIPAL REGISTER
- 08 May 2019 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 07 May 2019 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 13 Mar 2019 — ASSIGNED TO EXAMINER
- 22 Feb 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 21 Feb 2019 — STATEMENT OF USE PROCESSING COMPLETE
- 15 Feb 2019 — USE AMENDMENT FILED
- 21 Feb 2019 — SOU EXTENSION 3 GRANTED
- 15 Feb 2019 — SOU EXTENSION 3 FILED
- 21 Feb 2019 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 15 Feb 2019 — SOU TEAS EXTENSION RECEIVED
- 15 Feb 2019 — TEAS STATEMENT OF USE RECEIVED
- 07 Sept 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED