CUCLAD
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 08 Aug 2025)
What this means for you
Registered since 01 Jan 2019. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 86883676
- Registration number
- 5643850
- Mark type
- Stylized text
- Filed
- 22 Jan 2016
- Published for opposition
- 12 Sept 2017
- Registered
- 01 Jan 2019
- Attorney of record
- Michelle P. Ciotola
Goods and services
- Class 009 — Scientific and electric apparatus: Electronic circuit materials, namely, polymer composite laminates and bonding films for use in fabricating recognized printed wiring boards, all being structural components of the foregoing goods used to fabricate electronic circuits; electronic circuit material, namely, a dielectric substrate clad on one or both sides with a conductive layer for fabricating electronic circuits or unclad for use as a bonding layer, all being structural components of the foregoing goods used to fabricate electronic circuits
- Class 017 — Rubber goods: Electronic circuit material, namely, an insulated dielectric substrate material which is clad on one or both sides with a conductive layer for fabricating electronic circuits; Polymeric materials sold in sheet form, rods, blocks and other stock shapes, for use by third party manufacturers; microwave laminates and bonding films for use in manufacturing electronic circuitry; Fiber Reinforced Plastic Materials in Extruded, Molded and Machined Shapes for Use in Manufacture
Owner
- Rogers Corporation, Chandler, AZ, US
- Rogers Corporation, Chandler, AZ, US
- Rogers Corporation, Rogers, CT, US
Prosecution history
- 08 Aug 2025 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 08 Aug 2025 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 08 Aug 2025 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 07 Apr 2025 — TEAS SECTION 8 & 15 RECEIVED
- 01 Jan 2024 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 01 Jan 2019 — REGISTERED-PRINCIPAL REGISTER
- 30 Nov 2018 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 29 Nov 2018 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 28 Nov 2018 — STATEMENT OF USE PROCESSING COMPLETE
- 06 Nov 2018 — USE AMENDMENT FILED
- 26 Nov 2018 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 06 Nov 2018 — TEAS STATEMENT OF USE RECEIVED
- 09 May 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 07 May 2018 — SOU EXTENSION 1 GRANTED
- 07 May 2018 — SOU EXTENSION 1 FILED