MILLIKEN INFRASTRUCTURE

Dead / Cancelled — Cancelled — Section 8 (as of 18 Apr 2025)

What this means for you

This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
86860981
Registration number
5576236
Mark type
Design + words
Filed
29 Dec 2015
Published for opposition
06 Dec 2016
Registered
02 Oct 2018
Attorney of record
Charles G. Zug

Goods and services

  • Class 017 — Rubber goods: Polymer-based cement patching compounds for rehabilitating pipes, structures, buildings, tunnels, bridges, and roads; Polymer-based sealing compounds; Resin-impregnated fiberglass tapes for leak repair of pipes; Kits for the repair or reinforcement of damaged pipes comprising resin impregnated fiberglass tape and epoxy resin; High strength pipe remediation wrap comprising fiberglass reinforcement material that is impregnated with moisture cured polyurethane resins
  • Class 019 — Non-metallic building materials: Fiber-reinforced mortars; Inorganic polymer concretes; Carbon-fiber fabrics used as structural reinforcement materials; Cement-impregnated fabrics that harden after hydration for reinforcing culverts, ditches, berms, and other structures, and for slope-stabilization; Kits for the repair or reinforcement of damaged pipes comprising fiberglass fabric, adhesive primer, and epoxy resins; Kits for the repair or reinforcement of damaged pipes comprising moisture-cured fiberglass fabric and adhesive primer; Resin-impregnated carbon-fiber fabrics for the repair or reinforcement of pipes; Kits for the repair or reinforcement of damaged pipes comprising carbon-fiber fabric, adhesive primer, and epoxy resins

Owner

Prosecution history

  • 18 Apr 2025 — CANCELLED SEC. 8 (6-YR)
  • 02 Oct 2023 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 05 Jun 2019 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
  • 02 Oct 2018 — REGISTERED-PRINCIPAL REGISTER
  • 31 Aug 2018 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 30 Aug 2018 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 28 Aug 2018 — STATEMENT OF USE PROCESSING COMPLETE
  • 31 Jul 2018 — USE AMENDMENT FILED
  • 28 Aug 2018 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 31 Jul 2018 — TEAS STATEMENT OF USE RECEIVED
  • 02 Feb 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 31 Jan 2018 — SOU EXTENSION 2 GRANTED
  • 31 Jan 2018 — SOU EXTENSION 2 FILED
  • 31 Jan 2018 — SOU TEAS EXTENSION RECEIVED
  • 31 Jan 2018 — TEAS CHANGE OF CORRESPONDENCE RECEIVED

View this trademark record on Marksy