RUBICON OILFIELD INTERNATIONAL

Dead / Abandoned — Abandoned — no statement of use filed (as of 13 Jul 2020)

What this means for you

This application is over — abandoned 13 Jul 2020. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.

Record

Serial number
86820811
Mark type
Stylized text
Filed
16 Nov 2015
Published for opposition
16 Oct 2018
Abandoned
13 Jul 2020
Attorney of record
Patrick J. Jennings

Goods and services

  • Class 006 — Metal goods: Manufactured metal equipment to be positioned within oil and/or gas wells during drilling, completion, production, well abandonment and/or well work-over operations, namely, Metal drill pipes for use in well boring, tubing patches, casing patches, junk mills, rotary shoes, and collars; Metal casings used to stabilize the wellbore in oil and gas wells
  • Class 007 — Machines and machine tools: Manufactured metal equipment to be positioned within oil and/or gas wells during drilling, completion, production, well abandonment and/or well work-over operations, namely, reamers, hole openers, stabilizers, casing and drill pipe protectors, shock tools, drill bits, casing and reaming shoes, float shoes, collars, centralizers, wellbore clean up tools, casing rollers, casing scrapers, tubing scrapers, fishing tools, bumper subs, junk subs, crossover subs, circulating subs, wireline jars, power swivels, and downhole power systems, namely, motors, jars, shock tools, and accelerators

Owner

Prosecution history

  • 13 Jul 2020 — ABANDONMENT NOTICE E-MAILED - NO USE STATEMENT FILED
  • 13 Jul 2020 — ABANDONMENT - NO USE STATEMENT FILED
  • 07 Dec 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 05 Dec 2019 — SOU EXTENSION 2 GRANTED
  • 05 Dec 2019 — SOU EXTENSION 2 FILED
  • 05 Dec 2019 — SOU TEAS EXTENSION RECEIVED
  • 06 Apr 2019 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 04 Apr 2019 — SOU EXTENSION 1 GRANTED
  • 04 Apr 2019 — SOU EXTENSION 1 FILED
  • 04 Apr 2019 — SOU TEAS EXTENSION RECEIVED
  • 11 Dec 2018 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
  • 16 Oct 2018 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
  • 16 Oct 2018 — PUBLISHED FOR OPPOSITION
  • 26 Sept 2018 — NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
  • 12 Sept 2018 — APPROVED FOR PUB - PRINCIPAL REGISTER

View this trademark record on Marksy