GRIDLINK
Dead / Cancelled — Cancelled — Section 8 (as of 14 Feb 2025)
What this means for you
This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 86768497
- Registration number
- 5530605
- Mark type
- Stylized text
- Filed
- 25 Sept 2015
- Published for opposition
- 20 Sept 2016
- Registered
- 31 Jul 2018
- Attorney of record
- Cheryl A. Clarkin, Esq.
Goods and services
- Class 019 — Non-metallic building materials: Buildings and homes, namely, manufactured homes and pre-fabricated non-metal homes
- Class 037 — Building construction and repair services: Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; consulting services in the field of construction of wind energy facilities; installation and maintenance of solar energy based power plants; installation of geothermal energy based power plants; installation of renewable energy generation equipment; installation of solar energy systems and alternative energy products for residential and commercial use; plant construction, maintenance and construction project management services for businesses in the energy production and transmission sector; building construction services; construction of buildings and homes; custom construction of homes
Owner
- Stateside Precision Group, LLC, Newport, RI, US
- Stateside Precision Group, LLC, Newport, RI, US
- Stateside Precision Group, LLC, Newport, RI, US
Prosecution history
- 14 Feb 2025 — CANCELLED SEC. 8 (6-YR)
- 31 Jul 2023 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 21 Sept 2022 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 21 Sept 2022 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
- 21 Sept 2022 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
- 12 Jul 2019 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 10 Jun 2019 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 31 Jul 2018 — REGISTERED-PRINCIPAL REGISTER
- 27 Jun 2018 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 26 Jun 2018 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 05 Jun 2018 — STATEMENT OF USE PROCESSING COMPLETE
- 15 May 2018 — USE AMENDMENT FILED
- 05 Jun 2018 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 15 May 2018 — TEAS STATEMENT OF USE RECEIVED
- 15 May 2018 — TEAS CHANGE OF CORRESPONDENCE RECEIVED