KWL

Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 25 May 2024)

What this means for you

Registered since 21 Nov 2017. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
86666746
Registration number
5341149
Mark type
Stylized text
Filed
18 Jun 2015
Published for opposition
31 Jan 2017
Registered
21 Nov 2017
Attorney of record
Parna A. Mehrbani

Goods and services

  • Class 037 — Building construction and repair services: [ Installation of natural gas, biomass, waste heat-recovery, geo-exchange and geothermal energy based power plants ]
  • Class 040 — Treatment of materials: [ Waste water reprocessing services; technical consultation in the field of waste management; technical consulting in the field of solid and hazardous waste management, namely, planning and designing of solid waste management systems ]
  • Class 042 — Scientific and technological services: Civil engineering relating to water irrigation; civil engineering for constructing municipal water supply infrastructure systems; engineering services for the construction of water treatment and purification plants, solid waste treatment plants; civil engineering relating to water supply and wastewater collection systems; technical consultation in the field of power plant engineering, namely, testing and evaluation of power plant equipment to improve performance and efficiency; hydrologic and engineering modeling and design of measures to protect areas likely to be inundated by storm-water and flood-waters

Owner

Prosecution history

  • 25 May 2024 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
  • 25 May 2024 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
  • 25 May 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 21 Nov 2023 — TEAS SECTION 8 & 15 RECEIVED
  • 21 Nov 2022 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 16 May 2018 — ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED
  • 16 May 2018 — TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
  • 21 Nov 2017 — REGISTERED-PRINCIPAL REGISTER
  • 17 Oct 2017 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 16 Oct 2017 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 02 Oct 2017 — STATEMENT OF USE PROCESSING COMPLETE
  • 14 Sept 2017 — USE AMENDMENT FILED
  • 25 Sept 2017 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 14 Sept 2017 — TEAS STATEMENT OF USE RECEIVED
  • 28 Mar 2017 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT

View this trademark record on Marksy