MPD LITE
Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 06 Feb 2025)
What this means for you
Registered since 27 Mar 2018. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 86641185
- Registration number
- 5433753
- Mark type
- Stylized text
- Filed
- 26 May 2015
- Published for opposition
- 31 May 2016
- Registered
- 27 Mar 2018
- Attorney of record
- Stephen Schrantz
Goods and services
- Class 007 — Machines and machine tools: EARTH DRILLING MACHINES AND EQUIPMENT; POWER-OPERATED DRILLING RIGS; VALVES BEING PARTS OF MACHINES; PARTS OF WELLHEAD MACHINES, NAMELY, VALVES, CHOKE, AND MANIFOLD INDUSTRIAL PUMPS, PUMP AND VALVE PARTS, PIPE FITTINGS AND FLANGES; PRESSURE SWITCHES, SENSORS, AND REGULATORS FOR MONITORING, CONTROLLING, AND SWITCHING HYDRAULIC OR PNEUMATIC SYSTEMS IN EARTH DRILLING
- Class 009 — Scientific and electric apparatus: FLOW METERS; CLOSED LOOP PRESSURE CONTROL DEVICES AND EQUIPMENT; ANNULAR PRESSURE PROFILE CONTROL DEVICES AND EQUIPMENT
- Class 037 — Building construction and repair services: DRILLING SERVICES, NAMELY, CONSULTING SERVICES IN THE FIELD OF DRILLING EQUIPMENT USAGE AND MAINTENANCE; RENTAL OF DRILLING EQUIPMENT AND SUPPLIES
Owner
- OPTIMAL PRESSURE CONTROL LLC, Fort Smith, AR, US
- OPTIMAL PRESSURE CONTROL LLC, Fort Smith, AR, US
- OPTIMAL PRESSURE CONTROL LLC, Fort Smith, AR, US
Prosecution history
- 06 Feb 2025 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 06 Feb 2025 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 10 Dec 2024 — TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
- 28 Sept 2024 — POST REGISTRATION ACTION MAILED - SEC. 8 & 15
- 28 Sept 2024 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 27 Mar 2024 — TEAS SECTION 8 & 15 RECEIVED
- 27 Mar 2023 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 27 Mar 2018 — REGISTERED-PRINCIPAL REGISTER
- 21 Feb 2018 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 20 Feb 2018 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 02 Feb 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 01 Feb 2018 — STATEMENT OF USE PROCESSING COMPLETE
- 26 Jan 2018 — USE AMENDMENT FILED
- 01 Feb 2018 — SOU EXTENSION 3 GRANTED
- 26 Jan 2018 — SOU EXTENSION 3 FILED