DAMSAFE
Live / Registered — Registered (as of 18 May 2021)
What this means for you
Registered since 18 May 2021. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 86564940
- Registration number
- 6350933
- Mark type
- Stylized text
- Filed
- 16 Mar 2015
- Published for opposition
- 03 Dec 2019
- Registered
- 18 May 2021
- Attorney of record
- Hope Hamilton
Goods and services
- Class 009 — Scientific and electric apparatus: structural integrity monitoring systems comprising central processing units, computer hardware and software, deformation sensors, displacement sensors, pressure sensors, vibration sensors, vibration meters, electrical and optical cables for communication and signal transmission and electronic data recorders, all for monitoring the structural integrity of tailings dams, impoundment dams, embankments, dykes and other structures made of tailings, earth, rock, concrete and combinations of these materials
- Class 037 — Building construction and repair services: installation of structural integrity monitoring systems which monitor the structural integrity of tailings dams, impoundment dams, embankments, dykes and other structures made of tailings, earth, rock, concrete and combinations of these materials
- Class 042 — Scientific and technological services: electronic data collection, namely, electronic monitoring of structural integrity monitoring systems which monitor the structural integrity of tailings dams
Owner
- Weir-Jones Engineering Consultants Ltd., Vancouver, BC, CA
- Weir-Jones Engineering Consultants Ltd., Vancouver, BC, CA
- Weir-Jones Engineering Consultants Ltd., Vancouver, BC, CA
Prosecution history
- 18 May 2021 — REGISTERED-PRINCIPAL REGISTER
- 09 Apr 2021 — 1(B) BASIS DELETED; PROCEED TO REGISTRATION
- 07 Jan 2021 — NOTICE OF ALLOWANCE CANCELLED
- 09 Apr 2021 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
- 28 Jan 2021 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 26 Jan 2021 — SOU EXTENSION 2 GRANTED
- 26 Jan 2021 — SOU EXTENSION 2 FILED
- 26 Jan 2021 — SOU TEAS EXTENSION RECEIVED
- 07 Jan 2021 — TEAS DELETE 1(B) BASIS RECEIVED
- 29 Jul 2020 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 27 Jul 2020 — SOU EXTENSION 1 GRANTED
- 27 Jul 2020 — SOU EXTENSION 1 FILED
- 27 Jul 2020 — SOU TEAS EXTENSION RECEIVED
- 28 Jan 2020 — NOA E-MAILED - SOU REQUIRED FROM APPLICANT
- 03 Dec 2019 — OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED