A
Live / Registered — Registered — partial Sections 8 & 15 accepted and acknowledged (as of 25 Aug 2022)
What this means for you
Registered since 01 Nov 2016. The owner can stop confusingly similar uses in the classes it covers.
Record
- Serial number
- 86509395
- Registration number
- 5073918
- Mark type
- Design + words
- Filed
- 21 Jan 2015
- Published for opposition
- 05 Jan 2016
- Registered
- 01 Nov 2016
- Attorney of record
- Lynn E. Rzonca
Goods and services
- Class 037 — Building construction and repair services: Construction services, namely, residential building repair and maintenance, roofing, insulation installation, attic ventilation, flooring installation, snow and ice removal, siding installation, window and door installation, painting, gutter installation and maintenance, deck installation, ice dam prevention and removal, concrete paving, and masonry services; installation of metal roofs, sheet metal flashing, metal gutters and downspouts, metal wall systems, metal fences, and metal roof brackets
- Class 040 — Treatment of materials: Custom fabrication of metal roofs, sheet metal flashing, metal gutters and downspouts, metal wall systems, metal fences, and metal roof brackets
- Class 044 — Medical, beauty and agricultural services: [ Landscape design, landscape gardening ]
Owner
- ALLSTAR HOLDINGS LLC, MAPLE PLAIN, MN, US
- ALLSTAR CONSTRUCTION & MAINTENANCE, LLC, Eden Prairie, MN, US
- ALLSTAR CONSTRUCTION & MAINTENANCE, LLC, Edina, MN, US
- ALLSTAR CONSTRUCTION & MAINTENANCE, LLC, MAPLE PLAIN, MN, US
- PC Investment Holdings, Inc., Maple Plain, MN, US
Prosecution history
- 01 Nov 2025 — COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED
- 03 May 2023 — AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP
- 25 Aug 2022 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
- 25 Aug 2022 — REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
- 13 Aug 2022 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
- 25 Feb 2022 — TEAS SECTION 8 & 15 RECEIVED
- 01 Nov 2021 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 27 Feb 2018 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 09 Nov 2016 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 01 Nov 2016 — REGISTERED-PRINCIPAL REGISTER
- 24 Sept 2016 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 23 Sept 2016 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 20 Sept 2016 — STATEMENT OF USE PROCESSING COMPLETE
- 22 Aug 2016 — USE AMENDMENT FILED
- 14 Sept 2016 — CASE ASSIGNED TO INTENT TO USE PARALEGAL