WE MAKE LIFE GO

Live / Registered — Registered — Sections 8 & 15 accepted and acknowledged (as of 15 Sept 2023)

What this means for you

Registered since 04 Apr 2017. The owner can stop confusingly similar uses in the classes it covers.

Record

Serial number
86421819
Registration number
5176803
Mark type
Stylized text
Filed
13 Oct 2014
Published for opposition
07 Apr 2015
Registered
04 Apr 2017
Attorney of record
Kevin R. Casey

Goods and services

  • Class 035 — Advertising and business services: Business management services
  • Class 037 — Building construction and repair services: Building construction consulting, construction management supervision, utility construction of waste and wastewater systems, pipelines, trenches, manholes, and underground plants for the telecommunications, gas, electric, and water industries; installation of cables, ducts, conduits, wireless, and electrical wiring for the telecommunications, gas, electric, and water industries; restoration services in the nature of public utility repair of telecommunications, gas, electric, wireless, and water systems, namely, locating, installing, and repairing gas, power, water, and cable distribution equipment; and construction equipment rentals to railroads, transits, utility, and power companies and their contractors
  • Class 042 — Scientific and technological services: Conducting of construction feasibility studies; design engineering services of telecommunications, gas, electric, wireless, and water systems

Owner

Prosecution history

  • 15 Sept 2023 — NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED
  • 15 Sept 2023 — REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.
  • 15 Sept 2023 — CASE ASSIGNED TO POST REGISTRATION PARALEGAL
  • 15 Mar 2023 — TEAS SECTION 8 & 15 RECEIVED
  • 04 Apr 2022 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
  • 04 Apr 2017 — REGISTERED-PRINCIPAL REGISTER
  • 01 Mar 2017 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
  • 28 Feb 2017 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
  • 03 Feb 2017 — STATEMENT OF USE PROCESSING COMPLETE
  • 26 Apr 2016 — USE AMENDMENT FILED
  • 28 May 2016 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
  • 27 May 2016 — SOU EXTENSION 2 GRANTED
  • 26 Apr 2016 — SOU EXTENSION 2 FILED
  • 26 May 2016 — CASE ASSIGNED TO INTENT TO USE PARALEGAL
  • 26 Apr 2016 — SOU TEAS EXTENSION RECEIVED

View this trademark record on Marksy