FLYNN AMERICA
Dead / Abandoned — Abandoned — no statement of use filed (as of 26 Nov 2018)
What this means for you
This application is over — abandoned 26 Nov 2018. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 86197544
- Mark type
- Stylized text
- Filed
- 19 Feb 2014
- Published for opposition
- 25 Aug 2015
- Abandoned
- 26 Nov 2018
- Attorney of record
- Daniel F. Dovi
Goods and services
- Class 037 — Building construction and repair services: Building construction, namely, constructing and installing component parts of buildings and building envelope solutions, namely, curtain walls, interior and exterior glazing and glass wall structures, and facades and cladding, exclusively for the industrial, institutional, and commercial marketplaces, and expressly excluding general building contractor services, residential single family dwelling home contractor services, and building refinishing services; providing consulting in connection with the foregoing services in the field of building construction; Installation of renewable energy installations, namely, solar energy and solar photovoltaic systems
- Class 042 — Scientific and technological services: Design and engineering services for building condition assessment, namely, fabricating and designing component parts of buildings and building envelope solutions, namely, curtain walls, interior and exterior glazing and glass wall structures, and facades and cladding, exclusively for the industrial, institutional, and commercial marketplaces; Design of renewable energy installations, namely, solar energy and solar photovoltaic systems
Owner
- Flynn Canada LTD., Mississauga, Ontario, CA
- Flynn Canada LTD., Mississauga, Ontario, CA
Prosecution history
- 18 Aug 2021 — ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY
- 26 Nov 2018 — ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED
- 26 Nov 2018 — ABANDONMENT - NO USE STATEMENT FILED
- 20 Mar 2018 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 19 Mar 2018 — SOU EXTENSION 5 GRANTED
- 15 Mar 2018 — SOU EXTENSION 5 FILED
- 15 Mar 2018 — SOU TEAS EXTENSION RECEIVED
- 29 Aug 2017 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 25 Aug 2017 — SOU EXTENSION 4 GRANTED
- 25 Aug 2017 — SOU EXTENSION 4 FILED
- 25 Aug 2017 — SOU TEAS EXTENSION RECEIVED
- 01 May 2017 — ASSIGNED TO EXAMINER
- 16 Mar 2017 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 14 Mar 2017 — SOU EXTENSION 3 GRANTED
- 14 Mar 2017 — SOU EXTENSION 3 FILED