ZCL DUALAM
Dead / Cancelled — Cancelled — Section 8 (as of 20 Jan 2023)
What this means for you
This registration has been cancelled; it no longer blocks anyone on its own. The name may be available, but check before relying on it — rights can also come from actual use, not only from the register.
Record
- Serial number
- 85801737
- Registration number
- 4993680
- Mark type
- Stylized text
- Filed
- 13 Dec 2012
- Published for opposition
- 24 Dec 2013
- Registered
- 05 Jul 2016
- Attorney of record
- BRUCE H. LITTLE
Goods and services
- Class 019 — Non-metallic building materials: non-metal rigid PVC pipes reinforced with fiberglass used in chemical processing
- Class 020 — Furniture: Fiberglass-reinforced plastic storage tanks used in chemical processing; fiberglass-reinforced plastic aboveground storage tanks; fiberglass-reinforced plastic aboveground storage tank systems consisting primarily of plastic storage tanks, anchoring systems, fittings, piping and accessories; fiberglass-reinforced plastic storage tanks; fiberglass-reinforced plastic storage containers; fiberglass-reinforced plastic aboveground storage tanks for use aboveground; double-wall fiberglass drain tanks for the upstream petroleum market to store condensate or brine from the well head; Tank lining systems consisting primarily of fiberglass-reinforced plastic
- Class 037 — Building construction and repair services: installation, repair and maintenance of liquid storage tanks and storage tank systems
- Class 040 — Treatment of materials: custom manufacture of liquid storage tanks and storage tank systems
Owner
- ZCL COMPOSITES INC., Edmonton, CA
- ZCL COMPOSITES INC., Edmonton, CA
- ZCL COMPOSITES INC., Edmonton, CA
Prior registrations
Prosecution history
- 20 Jan 2023 — CANCELLED SEC. 8 (6-YR)
- 05 Jul 2021 — COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED
- 01 May 2018 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 18 Nov 2016 — TEAS CHANGE OF CORRESPONDENCE RECEIVED
- 05 Jul 2016 — REGISTERED-PRINCIPAL REGISTER
- 03 Jun 2016 — NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
- 02 Jun 2016 — ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
- 26 May 2016 — NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
- 25 May 2016 — STATEMENT OF USE PROCESSING COMPLETE
- 18 Feb 2016 — USE AMENDMENT FILED
- 25 May 2016 — SOU EXTENSION 3 GRANTED
- 18 Aug 2015 — SOU EXTENSION 3 FILED
- 09 May 2016 — NOTICE OF REVIVAL - E-MAILED
- 09 May 2016 — PETITION GRANTED - SOU FILED
- 05 May 2016 — FAX RECEIVED